AEP: substations in PJM planning materials

633 substation names presented in AEP zone documents.

SubstationDescribed askV as printedProjectsMentionsLast mentioned
Abert Existing 69 kV 1 4 2026-10-06
Adams Not stated 69 kV 1 3 2026-10-06
Addison Existing 138kV 1 3 2026-10-06
Adkins New 345 kV, 765 kV 3 3 2026-01-06
AE2-072 (Lammer) Not stated 138 kV 1 1 2024-10-18
Aladdin station Existing Not printed 1 3 2025-10-08
Albion Not stated 138kV 2 4 2024-10-08
Allen Existing 138 kV, 345/138kV, 345kV 3 5 2026-10-06
Aloe Vera SW New Not printed 1 3 2026-10-06
Altavista Existing 138 kV, 138kV 2 2 2025-12-12
Amlin Not stated Not printed 1 2 2024-12-13
Anchor Hocking Existing 69 kV 2 5 2026-10-06
Anguin Existing 138 kV 2 5 2026-10-06
Apple Ave Existing Not printed 1 2 2026-10-06
Apple Grove Not stated 138 kV 1 2 2024-10-08
Armory New 138 kV 1 2 2024-10-08
Arroyo Not stated 138kV 1 2 2024-10-08
Auburn Not stated 69kV 1 1 2024-12-13
Auglaize Existing 69 kV, 69kV 2 2 2025-12-08
Babbitt Existing 138 kV 1 2 2024-10-08
Babcock Existing 345kV 1 4 2026-10-06
Badger New 138 kV 3 5 2025-06-13
Baileysville Existing 138 kV, 46 kV 4 7 2026-10-06
Baker Not stated Not printed 1 1 2026-07-07
Ballah SS Not stated 69kV 2 2 2024-11-15
Barrenshe Existing Not printed 2 3 2026-09-18
Bass Existing 34.5kV 1 3 2025-10-08
Batesville Existing 345kV 2 6 2026-10-06
Beacon New 345 kV 1 2 2024-10-08
Bear Creek New 69/34kV, 69kV 1 2 2024-10-08
Beatty Existing 138 kV, 345 kV, 69kV 8 13 2026-10-06
Beatty Road Existing 138 kV, 69kV 4 4 2024-12-03
Beckley Existing 46 kV 1 2 2024-10-08
Belcher Mountain Existing Not printed 1 2 2024-10-08
Bellard station Existing 69 kV 1 3 2025-10-08
Belmont Not stated 138 kV 1 1 2026-10-16
Bens Creek Existing Not printed 1 2 2024-10-08
Benwood Existing 69kV 2 2 2024-11-15
Bermuda New 345 kV 1 2 2024-10-08
Berne Not stated 69 kV 1 3 2026-10-06
Bethel Existing 138 kV 1 1 2026-01-06
Bethel Road Existing 138 kV, 138/69/13.8 kV 3 4 2025-11-14
Beverly Not stated 345 kV 1 1 2026-10-06
Bevins Existing Not printed 1 1 2024-10-08
Bevins Metering Point Existing Not printed 1 1 Not reported
Bexley Existing 138 kV, 138kV 2 6 2025-10-08
Big Darby SS Not stated 69kV 2 2 2024-11-15
Big Rock Existing 34.5kV 2 3 2024-11-15
Big Sandy Existing 138 kV, 138kV 1 4 2026-10-06
Bixby Existing 138 kV, 138kV, 345 kV 5 10 2026-10-06
Blair Not stated 69kV 2 2 2025-11-14
Blaire Existing 69 kV 1 2 2024-10-08
Blendon Existing Not printed 1 2 2024-10-08
Bluff Point Existing 69 kV 1 1 2026-10-16
Bokes Creek Not stated 345 kV, 345kV 3 3 2025-01-07
Bolton Existing 138 kV, 138kV 4 5 2026-10-16
Botetourt Existing Not printed 1 1 2026-05-15
Boundary station New 138/69/34kV 1 3 2025-10-08
Bowyer Existing 46 kV 1 2 2024-10-08
Bradley Existing 138 kV, 46 kV 2 5 2026-10-06
Briar Mountain Existing Not printed 1 1 Not reported
Briar Mt. Existing Not printed 1 1 2024-10-08
Brie Existing 138 kV 1 2 2024-10-08
Broadford Existing 765 kV 1 1 2025-08-05
Brody Existing Not printed 1 1 2026-07-17
Buchanan Existing 138 kV, 138kV 2 2 2024-11-15
Buchanan South Existing 69kV 1 1 2026-01-16
Buckeye Steel Not stated 138 kV 1 1 2024-11-06
Bull Creek Not stated 34.5 kV 1 1 2024-11-15
Burr Oak Not stated 69 kV 1 1 2026-10-16
Busch Not stated 69 kV, 69kV 2 8 2026-10-06
Busseyville Existing 138 kV 1 4 2026-10-06
Butler Not stated 69kV 1 1 2024-12-13
Calvin Switch Not stated Not printed 1 1 2025-09-19
Cambridge Existing 34.5 kV 2 2 2025-11-14
Canal Not stated 138 kV 4 6 2026-10-06
Canton Central Existing 138 kV 1 4 2026-10-06
Capital Avenue Existing Not printed 1 3 2026-10-06
Carnegie Not stated 138 kV 2 2 2024-11-15
Carrollton Not stated 138 kV 1 3 2026-10-06
Carrothers Not stated Not printed 1 1 2026-07-17
Carswell Existing 138kV 1 2 2024-10-08
Catawba Existing 138/69 kV, 138/69/34.5 kV 3 3 2026-01-16
Cavett Not stated 69 kV 3 4 2024-11-15
Celtic New 345/138 kV 1 3 2024-12-13
Charger Station Existing 138kV 1 3 2025-10-08
Chauncey Existing 138 kV, 46 kV 2 2 2025-11-14
Chenoweth Not stated 345 kV 2 2 2024-12-03
Cherry Creek Existing Not printed 1 2 2024-10-08
Chickamauga New 138 kV 1 3 2026-10-06
Chinstrap New Not printed 1 1 Not reported
Clark Branch Existing Not printed 1 2 2024-10-08
Clark Lakes Not stated 69kV 2 2 2024-11-15
Claytor Existing 138kV 1 2 2024-10-08
Clell Existing Not printed 1 1 2025-07-18
Clell SS Existing Not printed 1 1 2025-03-14
Cleveland Existing 138kV 1 4 2026-10-06
Clinch River Existing 138kV 2 2 2025-07-18
Clinchfield Existing Not printed 2 2 2025-07-18
Clinton Existing 138 kV, 138kV 3 6 2026-07-17
Clouse Existing 138 kV & 69 kV 1 2 2024-10-08
Cloverdale Existing 138kV 2 2 2024-11-15
Coal City New 138 kV 1 2 2024-10-08
Coal Creek Existing 69kV 3 4 2025-07-18
Coalfields New 138/12 kV, 138kV 1 2 2024-10-08
Colby Existing 69kV 1 2 2024-10-08
Cole Existing 345 kV, 69kV 4 5 2026-01-06
Coleman Existing 69kV 2 4 2026-09-18
Columbia Gas Existing Not printed 1 2 2024-10-08
Commerce Not stated 69 kV, 69kV 1 3 2026-10-06
Conant Existing 34.5kV, 69kV 3 5 2026-10-06
Conaway New 69/12 kV 1 2 2024-10-08
Conesville New 345 kV, 765 kV 2 2 2026-01-06
Conrail SW New Not printed 1 3 2026-10-06
Corey Existing Not printed 3 3 2026-07-17
Coronado substation New 138kV and 69kV 1 1 2025-03-14
Corridor Existing 138 kV, 345 kV, 345KV 4 5 2025-01-07
Corwin Not stated 138kV 1 2 2024-10-08
Cosgray Existing 345 kV 1 2 2024-10-08
Cottageville Existing Not printed 1 2 2024-10-08
Crab Orchard Existing 46 kV 1 2 2024-10-08
Cranberry Creek New 138 kV 1 2 2024-10-08
Creek Walker Not stated 138kV 1 3 2026-10-06
Crooksville Not stated 138 kV 1 1 Not reported
Curleys New 345 kV 2 3 2026-04-07
Cyprus New 138 kV, 138kV, 345/138 kV 6 13 2026-10-06
Darbyville Not stated 69kV 2 2 2024-11-15
Darden Road Existing 138kV 1 1 2026-03-19
Davidson Existing 138/69 kV 1 2 2024-10-08
Deer Creek Not stated 69kV 2 2 2024-11-15
Desoto Existing 345 kV, 345kV 2 5 2025-10-08
Devil Anse Not stated 69kV 1 1 2024-10-08
Dewey Lake Street New 69/34.5kV 1 2 2024-10-08
Don Marquis Existing 345kV 1 3 2026-10-06
Dresser Not stated 345kV 1 2 2025-03-04
Drew station New 138/13.8 kV 1 3 2025-10-08
Dry Run SS Not stated 69kV 2 2 2024-11-15
Dublin Existing 138 kV 1 2 2024-10-08
Duck Creek Not stated 138 kV 1 1 2026-10-16
Dumont Existing 345kV, 765 kV 3 8 2026-10-06
Dunlap Existing 138kV, 69kV 2 6 2026-10-06
East Beckley New 138 kV 1 2 2024-10-08
East Elkhart Existing 138kV, 69kV 3 9 2026-10-06
East Lancaster Existing 69 kV 2 3 2024-10-18
East Leipsic Existing 138 kV, 138/69/34.5kV, 138kV 3 6 2026-10-06
East Lima Existing 138kV, 345 kV, 345kV 5 5 2025-11-14
East Liverpool Existing 138kV 2 3 2026-09-18
East Logan Existing 69 kV 1 2 2024-10-08
East Lynn Existing 138kV 1 3 2026-10-06
East Tiffin Not stated 69 kV 1 3 2026-10-06
East Willard Not stated Not printed 1 1 2026-07-17
East Wooster Existing 138 kV, 138kV 1 2 2026-10-06
Edison Not stated 138kV 1 3 2026-10-06
Eighth Street Not stated 69kV 1 2 2026-07-17
Elcona Existing 138kV 1 4 2026-10-06
Elcona Tap Existing 138kV 1 2 2026-10-06
Elderberry station Existing Not printed 1 3 2025-10-08
Elkhart Hydro Existing 69kV 1 3 2026-10-06
Elliot Not stated 69kV 1 1 2025-10-17
Elliott Not stated 69kV 1 1 2025-11-14
Ellison Road Not stated 138kV 1 2 2024-10-08
Erin Hills Switch New 69kV 1 3 2026-10-06
Etna Not stated Not printed 1 1 2024-10-08
Etna (OP) station Existing Not printed 1 1 Not reported
Etna Road Existing 40 kV 1 3 2025-10-08
Fairbanks Not stated 345kV 1 2 2025-03-04
Falcon Existing 69 kV 3 3 2026-05-15
Fall Creek Existing 345 kV, 345kV 2 5 2025-10-08
Fiesta New 138 kV, 138kV 3 4 2026-04-15
Fillmore Road New 138kV 1 3 2026-10-06
Findlay Center Existing 138/69/34.5 kV 2 2 2025-11-14
Firebrick Existing 69 kV 2 2 2024-11-15
Fisher Not stated 138kV 2 2 2025-11-14
Fisher Body Existing Not printed 1 1 2024-11-15
Flag City Existing Not printed 1 1 2025-08-15
Flatlick Existing 765kV 1 1 2026-06-02
Florence Road Existing Not printed 1 1 2026-07-17
Flowerfield SS Not stated Not printed 1 1 2026-07-17
Forest Existing 69kV 1 3 2026-10-06
Fort Steuben Not stated 69kV 1 1 Not reported
Fostoria Central Not stated 345 kV 1 1 2025-08-05
FourFlag station New 69/34.5kV 1 3 2025-10-08
Freebyrd Existing 138 kV 1 1 2026-08-14
Fremont Existing 138 kV 1 1 Not reported
Ft Steuben Not stated 69kV 1 2 2025-10-08
Gable Not stated 138 kV 1 1 2026-08-14
Galloway Existing 69kV 4 4 2025-11-14
Garden Creek Existing 138kV, 69kV 3 4 2025-07-18
Gary Not stated 88kV 1 2 2024-10-08
Gateway Existing 69kV 1 3 2026-10-06
Gavin Not stated 138kV, 69 kV 1 3 2026-10-06
Gay Not stated 138 kV 2 2 2024-12-03
Gearcon Sw. Existing 69kV 1 1 Not reported
Geneva Switch Existing 69 kV 1 2 2024-10-08
Genoa Not stated 138 kV, 138kV 3 3 2024-11-19
German Existing 138kV 1 4 2026-10-06
Giles New 138kV 1 2 2024-10-08
Glen Lyn Station Existing Not printed 1 3 2025-10-08
Glen White Existing Not printed 1 2 2024-10-08
Good Hope SW Not stated 138 kV 1 1 2025-10-17
Goodings Grove Not stated 345kV 1 1 2025-04-01
Grandview Station Existing Not printed 1 3 2025-10-08
Grant station Not stated 138 kV 1 1 2024-11-15
Grapevine Existing Not printed 1 2 2024-10-08
Green Acres Not stated 345 kV, 345kV 2 3 2025-04-01
Green Chapel New 138 kV, 345/138 kV 2 5 2025-10-08
Greenleaf Existing 34.5 kV, 34.5kV, 69kV 3 5 2026-10-06
Greensburg New 69/34.5 kV 1 3 2025-10-08
Greentown Existing 138kV, 765 kV, 765kV 4 5 2026-01-06
Greif Not stated 138 kV, 138kV 1 4 2026-10-06
Groves Corner station New 12 kV 1 3 2025-10-08
Grundy Existing 34.5 kV 2 3 2024-11-15
Guernsey Existing 765 kV 1 1 2026-01-06
Gund Existing 69kV 1 1 2024-10-08
Gund Metering Point Existing 69kV 1 1 Not reported
Guyandotte Not stated 138 kV 2 2 2025-11-14
Gwynneville New 345kV 2 7 2026-10-06
Gypsy Lane station Existing Not printed 1 3 2025-10-08
Hall Not stated 138 kV, 138kV 3 4 2025-11-14
Hammondsville Not stated 69kV 1 3 2025-10-08
Haners Existing 138kV, 69kV 1 3 2026-10-06
Hanging Rock Existing Not printed 2 2 2026-07-07
Hanna Not stated 345 kV, 345kV 2 6 2026-10-06
Hannibal Existing 138 kV, 138kV 3 11 2026-10-06
Hardy Existing Not printed 1 2 2024-10-08
Harrison Existing 138 kV, 69 kV 2 5 2026-10-06
Hartford Existing 138/69/34.5 kV, 69kV 4 5 2026-07-17
Hartland Existing 46 kV 2 2 2025-11-14
Hassle Switch New 138kV 1 2 2026-10-06
Hatfield Not stated 69kV 3 4 2025-11-14
Haviland Existing 138 kV, 138/69/13 kV, 138kV, 69 kV 9 10 2025-11-14
Hayden Existing 345 kV, 345kV 4 5 2026-01-06
Hazard Existing 69 kV 2 2 2025-11-14
Heath Existing Not printed 1 1 2026-04-15
Helium Switch New 69kV 1 3 2026-10-06
Heppner Not stated 138 kV 1 2 2024-10-08
Herlan Existing 138kV 1 1 2026-03-19
Hess Existing 138 kV 1 1 2026-01-06
Hess Street Existing 138 kV 2 2 2025-11-14
Hilliard Not stated 69 kV 1 2 2024-10-08
Hillsboro Not stated Not printed 1 1 2026-06-17
Hinton Station Existing 138 kV 1 3 2025-10-08
HMD Existing Not printed 1 1 2026-07-17
Holloway Not stated 345 kV 1 1 2026-10-06
Horizon New 138 kV 2 4 2025-03-14
Horn Mountain Existing 69kV 1 1 2025-07-18
Horn Mountain SS Existing Not printed 1 1 2025-03-14
Huff Creek Existing 138 kV 2 2 2025-11-14
Huffman Not stated 138 kV 1 2 2024-10-08
Huntington Court Existing 138/12 kV, 69 kV, 69kV 2 3 2026-01-16
Huntley Existing 138 kV, 138kV 2 6 2026-10-06
Hurley Existing Not printed 1 2 2024-10-08
Hurricane Existing Not printed 1 1 2024-11-15
Hyatt Existing 345 & 138 kV, 345 kV, 35kV 7 10 2026-10-06
Hydramatic Existing Not printed 1 1 2026-07-17
Illinois Rd Existing 69kV 1 2 2026-10-06
Illinois Road Not stated Not printed 1 1 Not reported
Industrial Park Not stated 138kV 1 2 2025-10-08
Innovation Existing 345/138 kV 1 2 2024-10-08
Ireland Road Existing Not printed 1 1 2024-11-15
Ironman Not stated 69kV 2 3 2026-04-15
Jacksons Ferry Existing 138 kV, 138kV 3 4 2024-11-15
Jarrett Existing 138/46 kV 2 2 2025-11-14
Jay Existing 69 kV 1 1 2026-10-16
Jefferson Existing 69 kV, 765 3 4 2025-03-04
Jennings Road Switch Not stated 69 kV 1 3 2026-10-06
Jenny Wiley SS Existing Not printed 1 1 2025-05-16
Jerome New 138 kV 1 3 2024-12-13
Jester New 765/345kV 2 2 2024-11-19
Jim Branch Existing 138kV, 46kV 2 4 2024-10-08
Johns Creek Existing 138/69kV, 69kV 4 7 2026-10-06
Jorden New 138 kV 1 2 2024-10-08
Joshua Falls Existing 765/138 kV 2 2 2025-11-14
Jug Existing 138 kV 1 1 Not reported
Jug St Existing 345/138 kV 2 2 2025-06-13
Jug Street Existing 138 kV 1 1 2024-10-08
Junction City Existing 138 kV 1 2 2024-10-08
Junction Tower Not stated 345 kV 1 3 2026-10-06
Kalamazoo Not stated 69kV 1 1 2025-04-11
Kammer Not stated 138 kV, 138kV, 345 kV 3 6 2026-10-06
Kanawha Existing 138 kV 1 3 2026-10-06
Karl Existing 138kV 1 2 2024-10-08
Keelette Existing 34.5kV, 69kV 3 4 2024-11-15
Keen Mountain Not stated 138kV 2 2 2024-11-15
Kekionga New 138kV/12kV 1 2 2024-10-08
Kelly Creek Not stated 46 kV 2 2 2025-11-14
Kenny Existing 138 kV 3 3 2026-07-17
Kenova Existing 138/69 kV 1 4 2026-10-06
Kenton Not stated 69kV 3 3 2026-06-17
Kenton2 Not stated 69 kV 1 1 2025-10-17
Kenwood Existing 46KV 2 2 2025-05-16
Kenzie Creek Existing 138/69kV, 138kV, 345 kV 3 6 2026-10-06
Kera Lakes New 138 kV 1 2 2024-10-08
Keystone Not stated Not printed 1 2 2024-10-08
Kiber station New 138 kV 2 5 2025-10-08
Kileville New 138 kV 1 3 2024-12-13
Killarney Existing 46 kV 1 2 2024-10-08
Kirk Existing 138 kV, 345 kV 2 2 2026-01-06
Kiwi New 138 kV 1 1 2026-08-14
Knotty Poplar Not stated 69 kV 1 1 2024-11-15
Knox Creek Existing Not printed 1 1 2025-07-18
Knox Creek SS Existing Not printed 1 1 2025-03-14
Kossuth Not stated 69kV 1 3 2026-10-06
Krone Switch New 138 kV 1 3 2026-10-06
Lake Street station Existing 69/12kV 1 3 2025-10-08
Lammer Not stated 138 kV 1 1 2024-11-15
Lamping Not stated 345 kV 1 1 2026-10-06
Lancaster Existing 69 kV 2 2 2024-10-08
Lancaster Junction Existing 69 kV 1 2 2024-10-08
Larrison Drive New 345 kV 1 3 2025-10-08
Lavalette Existing 138kV 1 3 2026-10-06
Lawton Park Not stated 34.5kV 1 2 2025-01-17
Lawton Switch Not stated 34.5kV 1 1 2025-01-17
Lazelle Not stated 69 kV, 69kV 2 7 2026-10-06
Leach Not stated 69 kV 1 2 2024-10-08
Leesville Existing 138kV 1 1 2025-05-06
Lemaster Not stated 138 kV 1 1 2025-10-17
Lester Creek Existing 69kV 1 2 2024-10-08
Lester Fork New 69/12kV, 69kV 1 2 2024-10-08
Lester Square New 138 kV 1 2 2024-10-08
Levee Not stated 138 kV 1 1 2026-10-16
Lick Existing 138 kV, 138kV, 69kV 6 10 2026-10-06
Ligonier Existing 138/12kV 1 3 2025-10-08
Lima Pump SS Not stated 34.5kV 2 2 2025-11-14
Lockbourne Not stated 138 kV 1 1 2025-10-17
Lockwood Road Existing Not printed 1 3 2026-10-06
Logan Not stated 138 kV 1 3 2026-10-06
Logtown Existing Not printed 1 2 2024-10-08
Looney Creek Existing 138kV, 69 kV, 69kV 2 4 2024-10-08
Lovedale Not stated Not printed 1 1 2026-10-16
LSII Existing 138 kV 1 2 2024-10-08
Lulu Not stated 765kV 1 2 2025-03-04
Macy New Not printed 1 2 2024-10-08
Maddox Creek Existing Not printed 2 4 2026-08-04
Madison Not stated 69 kV, 69kV 3 5 2026-10-06
Madison County New 345kV 1 3 2026-10-06
Maliszewski Existing 138 kV, 345 & 138 kV, 765 kV, 765/345 kV 9 11 2026-10-06
Malizsewski Existing Not printed 1 1 2026-03-19
Mammoth Not stated 46 kV 2 2 2025-11-14
Marianna Coal Not stated 138 kV 2 2 2025-11-14
Marion Road Existing 138 kV, 138kV 2 3 2024-11-06
Marion station Existing Not printed 1 5 2026-10-06
Mark Center Not stated 69 kV 1 1 2025-11-04
Markwest Existing Not printed 1 2 2024-10-08
Marquis station Not stated Not printed 1 1 2026-04-07
Marsh Fork Not stated 46 kV 2 2 2025-11-14
Marvin Existing Not printed 1 1 2025-07-18
Marvin SS Existing Not printed 1 1 2025-03-14
Marysiville Existing 345kV 1 1 2024-11-19
Marysville Existing 345 kV, 765 kV, 765kV 7 7 2026-01-06
Maysville Not stated Not printed 1 1 2026-06-17
McComb Not stated 138kV 1 1 2024-11-06
McDowell Not stated 34.5 kV 2 2 2025-11-14
McElroy Not stated Not printed 1 1 2026-09-18
Mckinley Existing 138kV 1 2 2024-10-08
Meadow Lake Existing 345 kV 1 1 2026-01-06
Melmore Not stated Not printed 1 1 2026-04-15
Memorial Drive Existing Not printed 2 4 2026-10-06
Mercers Bottom New 345 kV 1 2 2024-10-08
Middle Creek Not stated 69 kV 2 2 2025-11-14
Middlebury Not stated 34.5kV 3 3 2026-02-13
Middlebury Tap Existing 34.5kV 1 1 2026-10-06
Middleton Run Not stated 34.5kV 2 2 2024-11-15
Middleton Run SS Existing 34.5kV 1 3 2026-10-06
Milepost New 138kV 3 4 2025-11-14
Mill Creek Not stated 138 kV 1 1 2026-10-16
Miller Switch Station Existing Not printed 1 2 2024-10-08
Mineral Springs New 138 kV 1 2 2026-10-06
Mink station Existing 138kV 2 3 2025-06-13
Moneta Not stated 138 kV 2 2 2025-12-08
Monza New 345kV 1 3 2026-10-06
Moore Park Not stated 69kV 2 2 2026-07-17
Mottville Not stated Not printed 1 1 2025-09-19
Mound Not stated Not printed 1 3 2026-02-13
Mound St Not stated 138 kV 2 2 2024-12-03
Mound Street Existing 138kV 5 6 2026-07-17
Moundsville Not stated Not printed 1 1 2026-09-18
Mount Heron New 138kV and 69kV 2 3 2025-07-18
Mount Vernon Existing 69kV 2 2 2024-11-15
Mousey Switch Not stated 69 kV 1 3 2026-10-06
Mullens Existing 138 kV 2 2 2025-11-14
Muskingum Existing 138kV, 345 kV 2 5 2026-10-06
Muskingum River Existing 138kV, 345 kV 3 4 2026-10-06
Natrium Existing 138kV 2 2 2026-09-18
Navistar New 345kV 2 4 2026-10-06
NBY-7 New 138 kV 1 3 2026-10-06
NBY6 Existing Not printed 1 3 2026-10-06
New Carlisle Existing 138 kV 2 2 2025-11-14
New Lexington Existing 69 kV 1 2 2024-10-08
New Liberty Existing 34kV 1 3 2025-10-08
New Prairie New 345 kV, 345kV 2 6 2026-10-06
New Proctorville Existing 138 kV 2 2 2025-11-14
Newark Center Existing 138 kV 2 3 2026-01-06
Nickel New 138kV 1 1 2026-10-16
Niles station Existing Not printed 1 3 2025-10-08
North Baltimore Existing 34.5 kV 1 3 2025-10-08
North Beckley Existing 138/12 kV 1 2 2024-10-08
North Central Co-op Not stated 69kV 1 1 2025-10-17
North Delphos Existing Not printed 2 4 2026-04-15
North Haverhill Existing 69 kV, 69kV 1 3 2026-10-06
North Logan Existing 69 kV 1 2 2024-10-08
North Newark Existing 138/69/4 kV 2 2 2025-11-14
North Portland Existing 69 kV 1 1 2026-10-16
North Portsmouth Not stated 69 kV 1 3 2025-10-08
North Proctorville Not stated 138kV 1 2 2026-07-17
North Sub Station Existing 138 kV 1 3 2026-10-06
North Van Wert Not stated 69 kV 2 2 2024-11-15
North Wellsville Not stated Not printed 1 1 2026-09-18
North Willard Not stated Not printed 1 1 2026-07-17
Notre Dame Existing Not printed 1 3 2026-10-06
Nottingham Existing 138 kV 1 1 2026-08-14
Obetz Not stated Not printed 1 3 2026-02-13
Oertels Not stated 69 kV 1 2 2024-10-18
Oertels Corner Not stated 69 kV 1 3 2025-10-08
Ohio Central Existing 138 kV, 138kV 4 5 2026-01-06
Ohio University Not stated 69kV 2 2 2025-11-14
Olive Existing 138kV, 345kV 6 15 2026-10-06
Orebank Existing Not printed 1 1 2026-10-16
Ormet Not stated 138 kV 1 2 2026-10-06
Ormet No.1 Not stated 138kV 1 1 2025-03-14
Osolo Existing 69kV 1 3 2026-10-06
OSU Existing 138 kV 3 3 2026-01-06
Otter Not stated 138 kV 1 1 2025-12-12
Panther Existing Not printed 1 2 2024-10-08
Parkway Not stated 34.5kV 3 3 2026-02-13
Parkway Tap Existing 34.5kV 1 1 2026-10-06
Parsons Existing 138 kV 1 5 2026-10-06
Patrick Not stated 34.5 kV 1 1 2024-11-15
Pattonsville Switch New 138kV 1 1 2024-10-08
Pax Branch Existing Not printed 1 3 2026-10-06
Peach Not stated 138kV 1 1 2026-04-15
Pemberton Existing 138/46 kV 1 2 2024-10-08
Permac Existing Not printed 2 3 2025-03-14
Peter Creek New 69/12kV, 69kV 2 3 2026-09-18
Petros New 138 kV 1 3 2026-10-06
Pigeon River Existing Not printed 1 1 2026-07-17
Pike County New 765KV 1 3 2026-10-06
Pinson Switch Station New Not printed 1 1 2026-09-18
Pipeline S.S. New Not printed 1 2 2024-10-08
Pittsburgh Avenue Existing 69kV 1 1 2026-10-16
Platter Creek Existing 69 kV, 69kV 2 2 2025-12-08
Poe Road substation Existing 69 kV 1 3 2025-10-08
Pokagon station Existing 138/12kV 1 3 2025-10-08
Polaris Existing 138 kV, 138kV 3 5 2026-10-06
Polymer Not stated 138 kV 1 2 2024-10-08
Portage Existing 34.5kV 1 3 2025-10-08
Portage SW New Not printed 1 1 2024-10-18
Portland Existing 69kV 1 1 2026-10-16
Poston Not stated 138 kV 1 2 2024-10-08
Poth station Existing Not printed 1 3 2025-10-08
Prestonsburg Existing 46kV 2 2 2025-05-16
Price Existing 69 kV 1 2 2024-10-08
Progress Park Existing 138 kV 1 3 2026-10-06
Pulaski Not stated 138kV 1 2 2024-10-08
QTS North Not stated 138 kV 1 1 2024-10-08
Raikes Branch Existing Not printed 1 2 2024-10-08
Ralston Not stated 69 kV 2 2 2024-10-18
Randolph Existing 69 kV 1 2 2024-10-08
Rapoca Existing 69kV 1 2 2024-10-08
Reedy Creek Existing 138/69/34.5 kV 1 1 2026-10-16
Reno SW Not stated 138 kV 1 1 2026-10-16
Reno Switch Not stated Not printed 1 1 2026-10-16
Reynolds Not stated 345kV 1 3 2025-10-08
Rich Acres Existing 69 kV 1 2 2024-10-08
Richlands Existing 69kV 3 4 2024-11-15
Rio Existing Not printed 1 3 2026-10-06
Robb Avenue Existing 34.5kV 1 1 2026-08-14
Roberts Existing 138 kV, 138kV, 345 kV 8 9 2025-11-14
Robison Park Not stated 138kV 3 5 2024-11-06
Robyville Not stated Not printed 1 1 2026-09-18
Rockcastle Not stated 138 kV 2 2 2025-12-08
Rockhill OP Existing 138/34.5/11kV 1 1 2026-08-14
Rockport Not stated 765kV 1 2 2025-03-04
Rothadew Existing 69kV 1 2 2024-10-08
Rozelle Not stated Not printed 1 3 2026-02-13
RP Mone Not stated 345kV 1 1 2024-11-06
Ruble Not stated 138 kV 1 1 2024-10-08
Saint Clair Existing 138kV 2 2 2025-12-12
Saint Clair Avenue Existing 138 kV 2 5 2026-09-18
Salamonie New 69 kV 1 1 2026-10-16
Salmon substation New Not printed 1 1 2025-03-14
Sancus Switch New 69 kV 1 3 2026-10-06
Sand Branch New Not printed 1 2 2026-10-06
Sandridge 69kV substation Existing 69kV 1 3 2025-10-08
Sardinia Not stated Not printed 1 1 2026-06-17
Sawmill Not stated Not printed 1 2 2024-10-08
Scherers Switch Existing Not printed 1 2 2024-10-08
Schroyer Avenue Existing 69kV 3 5 2026-10-06
Second Fork Not stated 69kV 1 3 2026-10-06
Second Street Existing 69kV 2 3 2026-09-18
Selma Parker Not stated 138/69 kV 1 2 2024-10-08
Sharp Rd Not stated 69kV 1 1 2025-12-12
Sharp Road Existing 69 kV, 69kV 1 3 2026-10-06
Shawnee Not stated 69 kV 1 1 Not reported
Sherwood Existing 69 kV, 69kV 2 2 2025-12-08
Shockley Existing Not printed 1 2 2024-10-08
Short Hills Existing Not printed 1 1 2026-10-16
Sifford Existing 138 kV 2 3 2026-04-15
Simers New 69kV 1 3 2026-10-06
Sister Lakes Existing 34.5kV, 69/12kV 3 4 2024-11-15
Skeggs Branch Existing 69kV 3 4 2025-07-18
Skimmer Existing 69kV 2 2 2024-11-15
Slater Steel Existing 69kV 1 3 2025-10-08
Smith Mountain Existing 138 kV 3 3 2026-09-18
Snowville New 138/34.5 kV 1 2 2024-10-08
Somerton Existing 69 kV 1 1 2026-03-19
Sophia Existing 46 kV 1 2 2024-10-08
Sorenson Existing 138kV, 345kV, 765/345/138kV, 765kV 7 14 2026-10-06
Souder New 138 kV, 138/34.5 kV 2 3 2024-12-13
South Baltimore Existing 138 kV, 138kV 2 5 2026-10-06
South Cadiz Not stated 138 kV 2 2 2026-09-18
South Canton Existing 138 kV 2 7 2026-10-06
South Chester Existing Not printed 1 2 2024-10-08
South Coshocton Existing 138 kV, 138kV 2 3 2024-11-15
South Coshocton138kV station Existing 138kV 1 1 2024-10-18
South Greenwich Not stated Not printed 1 1 2026-07-17
South Kenton Existing 138 kV, 69kV 3 3 2026-01-06
South Kossuth Not stated Not printed 1 1 2026-04-15
South Lancaster Existing 138 kV & 69 kV 1 2 2024-10-08
South Neal Not stated 69 kV 1 2 2024-10-08
South Point Not stated 138 kV 1 2 2024-10-08
South Side Lima Existing 34.5 kV 2 2 2025-11-14
South Side Station Existing 138kV, 34.5kV 2 4 2026-03-19
South Toronto Existing 69 kV 2 2 2024-11-15
South Toronto Tap Not stated 69 kV 2 2 2024-11-15
South Van Wert Existing Not printed 1 2 2024-10-08
Southeast Canton Existing 138 kV 1 5 2026-10-06
Sowers Existing Not printed 1 3 2026-10-06
Sparrow Existing 69kV 1 2 2026-08-14
Speidel Not stated 69 kV 1 1 2026-03-19
Sporn Existing 138kV, 345 kV 2 5 2026-10-06
Sprigg Existing 138kV 1 2 2024-10-08
Spring St Existing 138kV 1 3 2025-10-08
Spy Run Not stated 34.5kV 1 3 2025-10-08
St Clair Avenue Not stated 138kV 2 2 2025-12-12
St. Clair Existing Not printed 1 1 2024-11-15
St. Clair Ave Existing 138 kV 1 2 2025-10-08
St. Clair Ave stations Existing Not printed 1 1 Not reported
Stadium Park Not stated Not printed 1 3 2026-10-06
Star-Cloverdale Not stated 138 kV 1 1 Not reported
Sterling Existing Not printed 1 1 2026-10-16
Stetson Run New Not printed 1 2 2025-03-14
Stinger Existing Not printed 1 1 2026-07-17
Stone Existing Not printed 1 2 2026-09-18
Stone Lake Not stated Not printed 1 1 2025-09-19
Stotesbury Existing Not printed 1 2 2024-10-08
Studebaker Existing Not printed 1 1 2025-11-14
Sullivan Existing 345kV, 765/345kV 1 4 2026-10-06
Summerhill Existing 69kV 1 4 2025-10-08
Sunnyside Existing 138 kV, 138kV, 345 kV, 345kV 6 12 2026-10-06
Swanson station Existing 69kV 1 3 2025-10-08
Sweeneysburg Switch Existing 138 kV 1 2 2024-10-08
Sweet Run S.S. New Not printed 1 2 2024-10-08
Switchback Not stated 138 kV, 138kV 2 5 2026-10-06
Tams Mountain Existing 46 kV 1 2 2024-10-08
Tanners Creek Not stated 345 kV, 345kV 3 8 2026-10-06
Tasjan New 138 kV, 138kV 2 3 2026-04-15
Taylor Existing 138 kV 1 2 2024-10-08
Tazewell Existing 138 kV, 138/34.5 kV 3 4 2025-11-14
Teays Existing Not printed 1 1 2024-11-15
Teddy New 765/345 kV 1 1 2026-01-06
Texas Eastern Not stated 69kV 2 2 2024-11-15
Thelma Existing 138 kV, 138kV, 46kV 3 6 2026-10-06
Thomas Existing 34.5 kV 2 3 2024-11-15
Thomas Road Existing 69 kV 2 2 2025-11-14
Thomson Not stated 345 kV 1 1 2025-10-08
Thorpe Not stated Not printed 1 2 2024-10-08
Tidd Existing 138 kV, 138kV 5 6 2026-04-15
Tiffin Center Not stated 138 kV 1 1 2026-04-15
Tiltonsville Existing 138 kV 2 2 2024-11-15
Timber SW Not stated 138 kV, 138kV 2 2 2025-11-14
Timber Switch Existing Not printed 1 2 2024-10-08
Timken Existing Not printed 1 4 2026-10-06
Timken Mercy Existing 69 kV 1 3 2026-10-06
Timken Richville Existing 138 kV 2 7 2026-10-06
Tom Watkins Existing Not printed 1 2 2026-09-18
Toronto Not stated 69kV 1 1 2024-11-15
Torrey Existing 138 kV 3 8 2026-10-06
Town of Richlands Not stated Not printed 2 2 2024-11-15
Trabue Existing 138 kV, 69kV 3 4 2025-11-14
Trail Fork Existing Not printed 2 4 2026-10-06
Trail Fork Stations Not stated 138 kV 1 1 Not reported
Tri-State Existing 138kV, 345 kV 2 5 2026-10-06
Triton New 138 kV 1 3 2026-10-06
Tug Fork New 69/12kV, 69kV 1 2 2024-10-08
Turner Station Existing 46 kV 1 3 2025-10-08
Twin Lakes Existing Not printed 1 1 2024-10-08
Twin Lakes Sw. Existing Not printed 1 1 Not reported
University Park Not stated 345kV 2 3 2025-04-01
Upper Sandusky Existing 69kV 2 4 2026-10-06
Valley Existing 138kV, 69/34.5kV 3 5 2026-10-06
Van Buren Not stated 138kV 1 2 2024-10-08
Van Lear SS Existing 46kV 2 2 2025-05-16
Van Wert Existing 69kV 3 4 2024-11-15
Vassell Existing 765 & 345 kV, 765V 2 3 2024-11-06
Veterans Not stated Not printed 1 2 2024-10-08
Vettel New 138 kV 1 4 2026-10-06
Vision New 69/12 kV 1 2 2024-10-08
Wagenhals Existing 138 kV 2 3 2026-06-17
Ward Hollow 46 kV Station Existing 46 kV 1 3 2025-10-08
Waverly Existing 138 kV 1 5 2026-10-06
Wellmont Not stated Not printed 1 1 2026-10-16
West Coshocton Not stated 138kV 1 2 2024-10-08
West Lancaster Existing 138 kV, 138 kV & 69 kV, 69kV 4 8 2026-10-06
West Millersburg Existing 138kV 1 2 2024-10-08
West Millersport New 138 kV, 345 kV, 765 kV 6 7 2026-01-06
West Moulton Not stated 69kV 1 3 2026-10-06
West Rockaway Not stated 69kV 1 2 2025-10-17
West Van Wert Not stated 69 kV 1 2 2024-10-08
Westar Not stated 138 kV, 138kV 3 3 2024-11-19
Wharncliffe Existing 69kV 1 2 2024-10-08
Whetstone Branch Existing 69KV, 69kV 3 4 2025-07-18
White Pigeon Not stated Not printed 1 1 2026-07-17
White Road Not stated 138kV 1 1 2024-11-06
Whitestick Existing 46 kV 1 2 2024-10-08
Whitewood Existing 138kV 2 2 2025-07-18
Wildcat Not stated Not printed 1 1 2026-06-17
Wildwood New 138 kV 1 2 2024-10-08
Willard Not stated Not printed 1 1 2026-07-17
Williard Not stated Not printed 1 1 2026-07-17
Wilson Not stated 138 kV, 138kV 3 4 2025-11-14
Winchester Existing 69 kV 1 2 2024-10-08
Windsor Not stated 138 kV 1 1 2024-11-15
Windsor Junction Not stated 138 kV 2 2 2024-11-15
Wolf Hills Existing 138 kV 1 2 2024-10-08
Wooster Existing 138kV 1 2 2024-10-08
Wurno Not stated 138kV, 34.5kV 1 2 2024-10-08
WVA Coal Not stated 46 kV 2 2 2025-11-14
Wyland Not stated 34.5kV 2 2 2024-11-15
Wyland SS Existing 34.5kV 1 3 2026-10-06
Wylie Ridge Not stated 138kV 1 2 2024-10-08
Yellow Bush Not stated 138 kV 1 2 2024-10-08
Zodiac New 138kv 1 3 2026-10-06

Before relying on any of this