Sancus Switch

Named in 3 PJM planning documents for 1 project, from January 16, 2026 to October 6, 2026.

Newdescribed as
AEPzone
69 kVkV as printed
3mentions

Described as new: “Install a 69 kV 2000A three-way phase over phase MOAB switch” — source, page 50

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Lazelle, OH/Bush, OH
AEP-2025-OH002 · s3905.1
Engineering $4.44 M 12/28/2027 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named BUSCH; LAZELLE → BUSCH; SANCUS 2025-02-14 2026-01-16
Substations named BUSCH; SANCUS → BUSCH; LAZELLE; SANCUS 2026-01-16 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-07* SRRTEP Western
AEP local plan submission of the supplemental projects for 2026 RTEP p. 50
Lazelle, OH/Bush, OH “Install a 69 kV 2000A three-way phase over phase MOAB switch”
69 kV
2026-10-06 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 50
Lazelle, OH/Bush, OH “Install a 69 kV 2000A three-way phase over phase MOAB switch”
69 kV
2026-01-16 SRRTEP Western
Item 01 - AEP supplemental projects p. 12
Lazelle, OH/Bush, OH “Sancus Switch: Install a 69 kV 2000A three-way phase”
69 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.