Vettel
Named in 4 PJM planning documents for 1 project, from April 15, 2026 to October 6, 2026.
Newdescribed as
AEPzone
138 kVkV as printed
4mentions
Described as new: “Construct a greenfield breaker and a half station operated as a ring bus” — source, page 110
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| South East Canton, OH AEP-2025-OH020 · s4061.1-4 |
Engineering | $31.766 M | 01/07/2028 | 312MW | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Cost estimate prior value printed on the same page |
$31.766 M → $33.07M | 2026-05-15 | 2026-05-15 |
| Cost estimate | $31.766 M → $33.07M | 2026-04-15 | 2026-05-15 |
| Cost estimate | $33.07M → $31.766 M | 2026-05-15 | 2026-10-06 |
| In-service date | 01/08/2028 → 01/07/2028 | 2025-09-19 | 2026-04-15 |
| Substations named | SOUTHEAST CANTON → SOUTH CANTON; SOUTHEAST CANTON; SUNNYSIDE; TIMKEN; TIMKEN RICHVILLE; TORREY; VETTEL | 2025-09-19 | 2026-04-15 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 110 |
South East Canton, OH | “Construct a greenfield breaker and a half station operated as a ring bus” 138 kV |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 110 |
South East Canton, OH | “Construct a greenfield breaker and a half station operated as a ring bus” 138 kV |
| 2026-05-15 | SRRTEP Western Item 01 - AEP Supplemental Projects p. 4 |
South East Canton, OH | “Construct a greenfield breaker and a half station” 138 kV |
| 2026-04-15 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 16 |
South East Canton, OH | “Construct a greenfield breaker and a half station” 138 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.