Substation Scout

Clinch River

Named in 2 PJM planning documents for 2 projects, from March 14, 2025 to July 18, 2025.

Existingdescribed as
AEPzone
138kVkV as printed
2mentions

Also printed as: Clinch River substation

PJM interconnection queue

A PJM queue substation page has the same name: Clinch River (VA) — 5 queue requests filed, 5 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AEP Transmission Zone: Baseline B3333 Reactivation and Scope Change
B3333
Not printed $106.589M 12/10/2027 Not printed 2025-07-18
SRRTEP Western
AEP Transmission Zone: Baseline B3333 Cancellation
B3333
Cancelled $40.171 M 6/1/2023 Not printed 2025-03-14
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$40.171 M → $106.589M 2025-07-18 2025-07-18

Every mention

DateDocumentProjectWhat the document says about it
2025-07-18 SRRTEP Western
Item 01 - Reliability Analysis Update p. 3
AEP Transmission Zone: Baseline B3333 Reactivation and Scope Change “Remote End work at Clinch River substation.”
138kV
2025-03-14 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 4
AEP Transmission Zone: Baseline B3333 Cancellation “Remote End work at Clinch River substation.”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this