Substation Scout

Toronto

Named in 1 PJM planning document for 1 project, on November 15, 2024.

Not stateddescribed as
AEPzone
69kVkV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AEP Transmission Zone: Baseline Toronto – South Toronto Tap 69kV Reconductor
b3879.1
Not printed $1.1M 6/1/2029 Not printed 2024-11-15
SRRTEP Western

Every mention

DateDocumentProjectWhat the document says about it
2024-11-15 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 32
AEP Transmission Zone: Baseline Toronto – South Toronto Tap 69kV Reconductor No role wording
69kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this