Substation Scout

Marysville

Named in 5 PJM planning documents for 7 projects, from November 6, 2024 to January 6, 2026.

Existingdescribed as
AEPzone
345 kV, 765 kV, 765kVkV as printed
7mentions

PJM interconnection queue

A PJM queue substation page has the same name: Marysville (OH, IN) — 9 queue requests filed, 4 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Marysville Substation Upgrades
B3878.1
Not printed $10M 4/1/2029 Not printed 2025-01-07
TEAC
Clusters AEP- 3, 4, 5
b3919.1
Not printed $145.494 M 12/31/2028 1.4GW 2025-01-07
TEAC
West Cluster Recommended Selection (2nd Read)
b4068.1
Not printed $2,768.0M 10/1/2032 Not printed 2026-01-06
TEAC
Marysville Substation Upgrades Not printed $10M 4/1/2029 Not printed 2024-12-03
TEAC
Clusters AEP- 3, 4, 5 (Shortlist) Not printed Not printed Not printed Not printed 2024-11-06
TEAC
Maliszewski 765/345 kV Upgrades Not printed 145.494 Not printed Not printed 2024-11-19
TEAC
Clusters AEP- 3, 4, 5
2024-W1-408
Not printed $145.494 12/31/2028 1115MW 2024-12-03
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-01-06 TEAC
Item 09 - Reliability Analysis Update p. 49
West Cluster Recommended Selection (2nd Read) “existing 765 kV Marysville substation”
765 kV
2025-01-07 TEAC
Item 12 - Reliability Analysis Update p. 40
Marysville Substation Upgrades “upgrade the existing wave trap towards Sorenson at Marysville substation”
765kV
2025-01-07 TEAC
Item 12 - Reliability Analysis Update p. 46
Clusters AEP- 3, 4, 5 “Upgrade 3000A 345 kV breaker 'L2' along with associated terminal elements to 5000A at Marysville”
345 kV
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 62
Marysville Substation Upgrades “Replace Marysville 765kV breakers B2 and B with 5000A 50KA breakers and upgrade the existing wave trap towards Sorenson at Marysville substation”
765kV
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 68
Clusters AEP- 3, 4, 5 “Upgrade 3000A 345 kV breaker 'L2' along with associated terminal elements to 5000A at Marysville”
345 kV
2024-11-19 TEAC
Item 1 - Reliability Analysis Update p. 30
Maliszewski 765/345 kV Upgrades No role wording
345 kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 55
Clusters AEP- 3, 4, 5 (Shortlist) No role wording
765 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.