Substation Scout

Fostoria Central

Named in 1 PJM planning document for 1 project, on August 5, 2025.

Not stateddescribed as
AEPzone
345 kVkV as printed
1mentions

PJM interconnection queue

A PJM queue substation page has the same name: Fostoria Central (OH) — 5 queue requests filed, 0 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
E. Lima, OH/Fostoria Ctl, OH
AEP-2025-OH018
Not printed Not printed 9/30/2028 300 MW 2025-08-05
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2025-08-05 TEAC
Item 07 - AEP Supplemental Projects p. 6
E. Lima, OH/Fostoria Ctl, OH No role wording
345 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this