Beatty Road

Named in 4 PJM planning documents for 4 projects, from October 18, 2024 to December 3, 2024.

Existingdescribed as
AEPzone
138 kV, 69kVkV as printed
4mentions

Also printed as: Beatty Road substation

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AEP Transmission Zone: Baseline Beatty 69kV Cap Bank
b3880.1
Not printed $2.25M 6/1/2029 Not printed 2024-11-15
SRRTEP Western
Cluster AEP-6
b3913.1
Not printed $33.113 M 4/30/2028 Not printed 2024-12-03
TEAC
AEP Transmission Zone: Baseline Beatty 69kV Cap Bank Not printed $2.25M 6/1/2029 Not printed 2024-10-18
SRRTEP Western
Cluster AEP-6
2024-W1-769
Not printed $33.113 M 4/30/2028 Not printed 2024-11-06
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 38
Cluster AEP-6 “between Beatty Road and Cyprus stations”
138 kV
2024-11-15 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 35
AEP Transmission Zone: Baseline Beatty 69kV Cap Bank “At Beatty Road substation, install a 69kV 23 Mvar capacitor bank along with the 69kV cap bank breaker.”
69kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 30
Cluster AEP-6 No role wording
138 kV
2024-10-18 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 34
AEP Transmission Zone: Baseline Beatty 69kV Cap Bank “At Beatty Road substation, install a 69kV 23 Mvar capacitor bank”
69kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this