Named in 4 PJM planning documents for 3 projects, from November 6, 2024 to October 6, 2026.
Existingdescribed as
AEPzone
138 kV, 345/138kV, 345kVkV as printed
5mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| West Cluster Recommended Selection (2nd Read) b4068.1 |
Not printed | $2,768.0M | 10/1/2032 | Not printed | 2026-01-06 TEAC |
| New Haven, Indiana AEP-2023-IM026 · s3750.1-4 |
Conceptual | $169.1 M | 07/01/2029 | 1200MW | 2026-10-06 TEAC |
| Fort Wayne, IN AEP-2024-IM014 |
Not printed | Not printed | Not printed | Not printed | 2024-11-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | ALLEN; ROBISON PARK; ZODIAC → ALLEN; ZODIAC | 2024-11-06 | 2026-10-06 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 3 |
New Haven, Indiana | “Expand Allen station” 345/138kV |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 3 |
New Haven, Indiana | “Expand Allen station with 2x additional 345/138kV transformers” 345/138kV |
| 2026-01-06 | TEAC Item 09 - Reliability Analysis Update p. 53 |
West Cluster Recommended Selection (2nd Read) | “Replace bus conductor at Allen station.” 138 kV |
| 2024-11-06 | TEAC Item 07 - AEP Supplemental Projects p. 3 |
Fort Wayne, IN | No role wording 345kV |
| 2024-11-06 | TEAC Item 07 - AEP Supplemental Projects p. 8 |
New Haven, Indiana | “Expand Allen station” 345/138kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.