Substation Scout

Triton

Named in 3 PJM planning documents for 1 project, from April 15, 2026 to October 6, 2026.

Newdescribed as
AEPzone
138 kVkV as printed
3mentions

Described as new: “Construct a greenfield breaker and a half station operated as a ring bus” — source, page 96

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Canton Central, OH
AEP-2025-OH021 · s4022.1-5
Engineering $21.961 M 01/08/2028 300MW 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named CANTON CENTRAL; TRITON → CANTON CENTRAL; TIDD; TRITON; WAGENHALS 2026-10-06 Not reported
Substations named CANTON CENTRAL → CANTON CENTRAL; TIDD; TRITON; WAGENHALS 2025-09-19 2026-04-15
Substations named CANTON CENTRAL; TIDD; TRITON; WAGENHALS → CANTON CENTRAL; TRITON 2026-04-15 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-07* SRRTEP Western
AEP local plan submission of the supplemental projects for 2026 RTEP p. 96
Canton Central, OH “Construct a greenfield breaker and a half station operated as a ring bus”
138 kV
2026-10-06 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 96
Canton Central, OH “Construct a greenfield breaker and a half station operated as a ring bus”
138 kV
2026-04-15 SRRTEP Western
Item 04 - AEP Supplemental Projects p. 18
Canton Central, OH “Construct a greenfield breaker and a half station”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.