Named in 4 PJM planning documents for 2 projects, from October 18, 2024 to October 6, 2026.

Existingdescribed as
AEPzone
—kV as printed
4mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Lancaster, OH
AEP-2024-OH031, AEP-2024-OH044 · s3955.1-6
Engineering $33.852 M 12/01/2028 Not printed 2026-10-06
TEAC
West Lancaster, OH
AEP-2024-OH044
Not printed Not printed Not printed Not printed 2024-10-18
SRRTEP Western

Every mention

DateDocumentProjectWhat the document says about it
2026-10-07* SRRTEP Western
AEP local plan submission of the supplemental projects for 2026 RTEP p. 71
Lancaster, OH “Replace the existing Memorial Drive phase over phase switching structure”
2026-10-06 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 71
Lancaster, OH “Replace the existing Memorial Drive phase over phase switching structure”
2026-06-17 SRRTEP Western
Item 04 - AEP Supplemental Projects p. 11
Lancaster, OH “Memorial Drive Switching Structure: Replace the existing Memorial Drive phase over phase switching structure”
2024-10-18 SRRTEP Western
Item 06 - AEP Supplemental Projects p. 5
West Lancaster, OH No role wording

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.