Substation Scout

Helium Switch

Named in 3 PJM planning documents for 1 project, from November 14, 2025 to October 6, 2026.

Newdescribed as
AEPzone
69kVkV as printed
3mentions

Described as new: “Build a 3-way Auto-sectionalizing POP switch” — source, page 37

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Forest3, OH/Upper Sandusky, OH
AEP-2025-OH009 · s3840.1-3
Engineering $4.901 M 07/01/2026 13.5MW 2026-10-06
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-10-07* SRRTEP Western
AEP local plan submission of the supplemental projects for 2026 RTEP p. 37
Forest3, OH/Upper Sandusky, OH “Build a 3-way Auto-sectionalizing POP switch”
2026-10-06 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 37
Forest3, OH/Upper Sandusky, OH “Build a 3-way Auto-sectionalizing POP switch”
2025-11-14 SRRTEP Western
Item 03 - AEP Supplemental Projects p. 10
Forest3, OH/Upper Sandusky, OH “Build a 3-way Auto-sectionalizing POP switch”
69kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this