NBY-7
Named in 3 PJM planning documents for 1 project, from January 17, 2025 to October 6, 2026.
Newdescribed as
AEPzone
138 kVkV as printed
3mentions
Described as new: “customer's new NBY-7 station” — source, page 108
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| New Albany, OH AEP-2023-OH068 · s4060.1 |
Engineering | $0.6 M | 8/1/2025 | 720 MW | 2026-10-06 TEAC |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 108 |
New Albany, OH | “customer's new NBY-7 station” |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 108 |
New Albany, OH | “extending it to the customer's new NBY-7 station” 138 kV |
| 2025-01-17 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 6 |
New Albany, OH | “extending it to the customer's new NBY-7 station on their
site” 138 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.