Named in 5 PJM planning documents for 4 projects, from October 18, 2024 to January 6, 2026.
PJM interconnection queue
A PJM queue substation page has the same name: Greentown (IN) — 7 queue requests filed, 0 active.
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| AEP Transmission Zone: Baseline
Greentown 138kV CS-XT5 Circuit Switcher Replacement b3887.1 |
Not printed | $1.0M | 6/1/2026 | Not printed | 2024-11-15 SRRTEP Western |
| West Cluster Recommended Selection (2nd Read) b4068.1 |
Not printed | $2,768.0M | 10/1/2032 | Not printed | 2026-01-06 TEAC |
| AEP Transmission Zone: Baseline Greentown 138kV CS-XT5 Circuit Switcher Replacement | Not printed | $1.0M | 6/1/2026 | Not printed | 2024-10-18 SRRTEP Western |
| Greentown, IN AEP-2024-IM018 |
Conceptual | $173M | 2032-2034 | Not printed | 2025-03-04 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Cost estimate | $173M → $0M (PJM) | 2025-03-04 | 2026-10-06 |
| In-service date | 06/01/2032 → 2032-2034 | 2024-12-03 | 2025-03-04 |
| Substations named | BABCOCK; DRESSER; FAIRBANKS; GREEN ACRES; GREENTOWN; GWYNNEVILLE; HANNA; JEFFERSON; LULU; OLIVE; ROCKPORT; SORENSON; SULLIVAN; TANNERS CREEK; UNIVERSITY PARK → BABCOCK; BATESVILLE; DRESSER; FAIRBANKS; FALL CREEK; GREEN ACRES; GREENTOWN; GWYNNEVILLE; HANNA; JEFFERSON; LULU; MADISON COUNTY; OLIVE; PIKE COUNTY; ROCKPORT; SORENSON; SULLIVAN; SUNNYSIDE; TANNERS CREEK; UNIVERSITY PARK | 2024-12-03 | 2025-03-04 |
| Substations named | BABCOCK; BATESVILLE; DRESSER; FAIRBANKS; FALL CREEK; GREEN ACRES; GREENTOWN; GWYNNEVILLE; HANNA; JEFFERSON; LULU; MADISON COUNTY; OLIVE; PIKE COUNTY; ROCKPORT; SORENSON; SULLIVAN; SUNNYSIDE; TANNERS CREEK; UNIVERSITY PARK → BABCOCK; BATESVILLE; GWYNNEVILLE; MADISON COUNTY; PIKE COUNTY; SORENSON; SULLIVAN | 2025-03-04 | 2026-10-06 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-01-06 | TEAC Item 09 - Reliability Analysis Update p. 48 |
West Cluster Recommended Selection (2nd Read) | “existing Greentown 765 kV substation” 765 kV |
| 2025-03-04 | TEAC Item 08 - AEP Supplemental Projects p. 3 |
Greentown, IN | No role wording 765kV |
| 2024-12-03 | TEAC Item 08 - AEP Supplemental Projects p. 4 |
Greentown, IN | No role wording 765kV |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 13 |
AEP Transmission Zone: Baseline Greentown 138kV CS-XT5 Circuit Switcher Replacement | “Replace over duty Greentown 138kV circuit switcher CS-XT” 138kV |
| 2024-10-18 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 11 |
AEP Transmission Zone: Baseline Greentown 138kV CS-XT5 Circuit Switcher Replacement | “Replace over duty Greentown 138kV circuit switcher CS-XT” 138kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.