Named in 4 PJM planning documents for 2 projects, from November 14, 2025 to October 6, 2026.
Existingdescribed as
AEPzone
69kVkV as printed
4mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Forest3, OH/Upper Sandusky, OH AEP-2025-OH009 · s3840.1-3 |
Engineering | $4.901 M | 07/01/2026 | 13.5MW | 2026-10-06 TEAC |
| Upper Sandusky AEP-2026-OH029 |
Not printed | Not printed | Not printed | Not printed | 2026-08-14 SRRTEP Western |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 37 |
Forest3, OH/Upper Sandusky, OH | “upgrade remote end relay settings at Forest and Upper Sandusky stations” |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 37 |
Forest3, OH/Upper Sandusky, OH | “upgrade remote end relay settings at Forest and Upper Sandusky stations” 69kV |
| 2026-08-14 | SRRTEP Western Item 03 - AEP Supplemental Projects p. 4 |
Upper Sandusky | “Upper Sandusky 69kV Station:
Equipment Material Condition, Performance and Risk” 69kV |
| 2025-11-14 | SRRTEP Western Item 03 - AEP Supplemental Projects p. 10 |
Forest3, OH/Upper Sandusky, OH | “upgrade remote end relay settings at Forest and Upper Sandusky stations” 69kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.