Substation Scout

Madison

Named in 5 PJM planning documents for 3 projects, from October 18, 2024 to October 6, 2026.

Not stateddescribed as
AEPzone
69 kV, 69kVkV as printed
5mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AEP Transmission Zone: Baseline Beatty 69kV Cap Bank
b3880.1
Not printed $2.25M 6/1/2029 Not printed 2024-11-15
SRRTEP Western
AEP Transmission Zone: Baseline Beatty 69kV Cap Bank Not printed $2.25M 6/1/2029 Not printed 2024-10-18
SRRTEP Western
Harrison, OH/Madison, OH
AEP-2025-OH001 · s3829.1-4
Engineering $11.015 M 06/08/2029 17.5 MW 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 12/2026 → 06/08/2029 2025-02-14 2025-09-19

Every mention

DateDocumentProjectWhat the document says about it
2026-10-07* SRRTEP Western
AEP local plan submission of the supplemental projects for 2026 RTEP p. 23
Harrison, OH/Madison, OH No role wording
69 kV
2026-10-06 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 23
Harrison, OH/Madison, OH No role wording
69 kV
2025-09-19 SRRTEP Western
Item 06 - AEP Supplemental Projects p. 14
Harrison, OH/Madison, OH No role wording
69 kV
2024-11-15 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 34
AEP Transmission Zone: Baseline Beatty 69kV Cap Bank No role wording
69kV
2024-10-18 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 33
AEP Transmission Zone: Baseline Beatty 69kV Cap Bank No role wording
69kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this