Substation Scout

Meadow Lake

Named in 1 PJM planning document for 1 project, on January 6, 2026.

Existingdescribed as
AEPzone
345 kVkV as printed
1mentions

PJM interconnection queue

A PJM queue substation page has the same name: Meadow Lake (IN) — 11 queue requests filed, 8 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
West Cluster Recommended Selection (2nd Read)
b4068.1
Not printed $2,768.0M 10/1/2032 Not printed 2026-01-06
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-01-06 TEAC
Item 09 - Reliability Analysis Update p. 54
West Cluster Recommended Selection (2nd Read) “Replace four 345 kV circuit breakers.”
345 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this