Polaris
Named in 5 PJM planning documents for 3 projects, from November 6, 2024 to October 6, 2026.
Existingdescribed as
AEPzone
138 kV, 138kVkV as printed
5mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Clusters AEP- 3, 4, 5 (Shortlist) | Not printed | Not printed | Not printed | Not printed | 2024-11-06 TEAC |
| Maliszewski-Polaris Rebuild | Not printed | 8.884 | Not printed | Not printed | 2024-11-19 TEAC |
| Maliszewski Station Improvements AEP-2026-OH008 · s4025.1-4 |
Conceptual | $12.57 M | 09/15/2027 | 25 MW | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| In-service date | late 2027 → 09/15/2027 | 2026-03-19 | 2026-07-17 |
| Substations named | MALIZSEWSKI → HYATT; MALISZEWSKI; POLARIS | 2026-03-19 | 2026-07-17 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 102 |
Maliszewski Station Improvements | “Add a new 138 kV circuit breaker to Polaris station” 138 kV |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 102 |
Maliszewski Station Improvements | “Add a new 138 kV circuit breaker to Polaris station” 138 kV |
| 2026-07-17 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 10 |
Maliszewski Station Improvements | “Add a new 138 kV circuit breaker to Polaris station” 138 kV |
| 2024-11-19 | TEAC Item 1 - Reliability Analysis Update p. 30 |
Maliszewski-Polaris Rebuild | No role wording 138 kV |
| 2024-11-06 | TEAC Item 13 - Reliability Analysis Update p. 54 |
Clusters AEP- 3, 4, 5 (Shortlist) | No role wording 138kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.