Schroyer Avenue
Named in 5 PJM planning documents for 3 projects, from October 18, 2024 to October 6, 2026.
Existingdescribed as
AEPzone
69kVkV as printed
5mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| AEP Transmission Zone: Baseline
Schroyer Avenue 69kV M and N CB Replacements b3885.1 |
Not printed | $2.0M | 6/1/2026 | Not printed | 2024-11-15 SRRTEP Western |
| AEP Transmission Zone: Baseline Schroyer Avenue 69kV M and N CB Replacements | Not printed | $2.0M | 6/1/2026 | Not printed | 2024-10-18 SRRTEP Western |
| Timken Mercy Rebuild AEP-2023-OH009 · s3959.1-3 |
Engineering | $7.195 M | 05/04/2028 | Not printed | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | SCHROYER AVENUE; STADIUM PARK; TIMKEN MERCY → EIGHTH STREET; SCHROYER AVENUE; STADIUM PARK; TIMKEN MERCY | 2026-10-06 | Not reported |
| Substations named | EIGHTH STREET; SCHROYER AVENUE; STADIUM PARK; TIMKEN MERCY → SCHROYER AVENUE; STADIUM PARK; TIMKEN MERCY | 2026-07-17 | 2026-10-06 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 88 |
Timken Mercy Rebuild | “Remote end relaying work to accommodate new breaker at Timken Mercy” 69kV |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 88 |
Timken Mercy Rebuild | “Remote end relaying work to accommodate new breaker at Timken Mercy” 69kV |
| 2026-07-17 | SRRTEP Western Item 04 - AEP Supplemental Projects p. 15 |
Timken Mercy Rebuild | “Remote end relaying work to accommodate new breaker at Timken Mercy” 69kV |
| 2024-11-15 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 25 |
AEP Transmission Zone: Baseline Schroyer Avenue 69kV M and N CB Replacements | “Replace over duty Schroyer Avenue 69kV circuit breakers M and N” 69kV |
| 2024-10-18 | SRRTEP Western Item 01 - SRRTEP West - Reliability Analysis Update p. 23 |
AEP Transmission Zone: Baseline Schroyer Avenue 69kV M and N CB Replacements | “Replace over duty Schroyer Avenue 69kV circuit breakers M and N” 69kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.