Krone Switch

Named in 3 PJM planning documents for 1 project, from September 19, 2025 to October 6, 2026.

Newdescribed as
AEPzone
138 kVkV as printed
3mentions

Described as new: “Install phase over phase switch” — source, page 27

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Windsor, OH
AEP-2025-OH004 · s3831.1-3
Conceptual $2.455 M 02/18/2027 20 MW 2026-10-06
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-10-07* SRRTEP Western
AEP local plan submission of the supplemental projects for 2026 RTEP p. 27
Windsor, OH “Install phase over phase switch”
138 kV
2026-10-06 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 27
Windsor, OH “Install phase over phase switch cut into the Sunnyside - Carrollton 138 kV circuit”
2025-09-19 SRRTEP Western
Item 06 - AEP Supplemental Projects p. 18
Windsor, OH “Install phase over phase switch cut into the Sunnyside - Carrollton 138 kV circuit”
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.