Substation Scout

Canton Central

Named in 4 PJM planning documents for 1 project, from September 19, 2025 to October 6, 2026.

Existingdescribed as
AEPzone
138 kVkV as printed
4mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Canton Central, OH
AEP-2025-OH021 · s4022.1-5
Engineering $21.961 M 01/08/2028 300MW 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named CANTON CENTRAL; TRITON → CANTON CENTRAL; TIDD; TRITON; WAGENHALS 2026-10-06 Not reported
Substations named CANTON CENTRAL → CANTON CENTRAL; TIDD; TRITON; WAGENHALS 2025-09-19 2026-04-15
Substations named CANTON CENTRAL; TIDD; TRITON; WAGENHALS → CANTON CENTRAL; TRITON 2026-04-15 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-07* SRRTEP Western
AEP local plan submission of the supplemental projects for 2026 RTEP p. 95
Canton Central, OH “Expand Canton Central with the installation of (3) 138 kV 4000A 63kA circuit breakers”
138 kV
2026-10-06 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 96
Canton Central, OH “Expand Canton Central with the installation of (3) 138 kV 4000A 63kA circuit breakers”
138 kV
2026-04-15 SRRTEP Western
Item 04 - AEP Supplemental Projects p. 18
Canton Central, OH “Expand Canton Central with the installation of”
138 kV
2025-09-19 SRRTEP Western
Item 06 - AEP Supplemental Projects p. 4
Canton Central, OH “AEP’s existing Canton Central station”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this