Substation Scout

Altavista

Named in 2 PJM planning documents for 2 projects, from May 6, 2025 to December 12, 2025.

Existingdescribed as
AEPzone
138 kV, 138kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AEP/Dominion Transmission Zones 138kV Line Leesville(AEP) – Altavista(DOM)
b4000.207
Not printed 1.6 M 12/31/2029 Not printed 2025-05-06
TEAC
b4000.209 Cancellation
b4000.209
Cancelled $1.2 M 6/1/2029 Not printed 2025-12-12
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$0.6 M → 1.6 M 2025-05-06 2025-05-06

Every mention

DateDocumentProjectWhat the document says about it
2025-12-12 SRRTEP Western
Item 16 - SRRTEP West - Reliability Analysis Update p. 8
b4000.209 Cancellation No role wording
138 kV
2025-05-06 TEAC
Item 10 - Reliability Analysis Update p. 11
AEP/Dominion Transmission Zones 138kV Line Leesville(AEP) – Altavista(DOM) “(DOM) Altavista 138kV Station Upgrade: Replace”
138kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this