Erin Hills Switch

Named in 3 PJM planning documents for 1 project, from September 19, 2025 to October 6, 2026.

Newdescribed as
AEPzone
69kVkV as printed
3mentions

Described as new: “Install a 69 kV, 1200A 3-way phase-over-phase switch” — source, page 23

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Harrison, OH/Madison, OH
AEP-2025-OH001 · s3829.1-4
Engineering $11.015 M 06/08/2029 17.5 MW 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 12/2026 → 06/08/2029 2025-02-14 2025-09-19

Every mention

DateDocumentProjectWhat the document says about it
2026-10-07* SRRTEP Western
AEP local plan submission of the supplemental projects for 2026 RTEP p. 23
Harrison, OH/Madison, OH “Install a 69 kV, 1200A 3-way phase-over-phase switch”
69kV
2026-10-06 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 23
Harrison, OH/Madison, OH “Install a 69 kV, 1200A 3-way phase-over-phase switch”
69kV
2025-09-19 SRRTEP Western
Item 06 - AEP Supplemental Projects p. 14
Harrison, OH/Madison, OH “Install a 69 kV, 1200A 3-way phase-over-phase switch with MOAB switches”
69kV