Franklin Furnace SW

Named in 1 PJM planning document for 1 project, on December 1, 2026.

Existingdescribed as
AEPzone
—kV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Razzler Customer Delivery
AEP-2025-OH014, AEP-2026-OH043
Conceptual $416.94 M 11/07/2028 1000MW 2026-12-01
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 05/01/2029 → 11/07/2028 2025-08-05 2026-12-01
Substations named HANGING ROCK → ALTHEA; BONZO; DISTERDICK; EAST HAVERHILL; FRANKLIN FURNACE SW; HANGING ROCK; HAVERHILL; IRONTON; JEFFERSON; NORTH HAVERHILL; PORTSMOUTH; RAZZLER 2025-08-05 2026-12-01

Every mention

DateDocumentProjectWhat the document says about it
2026-12-01 TEAC
Item 03 - AEP Supplemental Projects - Presentation p. 20
Razzler Customer Delivery “Rebuild From Franklin Furnace SW to Althea Station”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.