Don Marquis

Named in 3 PJM planning documents for 1 project, from April 7, 2026 to October 6, 2026.

Existingdescribed as
AEPzone
345kVkV as printed
3mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Don Marquis, OH
AEP-2026-OH004 · s3864.1-6
Conceptual $156.6 M 12/31/2027 800 MW 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 12/2027 → 12/31/2027 2026-02-03 2026-04-07
Substations named DON MARQUIS; MARQUIS; MONZA → DON MARQUIS; MONZA 2026-04-07 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-07* SRRTEP Western
AEP local plan submission of the supplemental projects for 2026 RTEP p. 29
Don Marquis, OH “Install four (4) 63kA 5000A breakers”
345kV
2026-10-06 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 29
Don Marquis, OH “Install four (4) 63kA 5000A breakers for two (2) additional feeds”
345kV
2026-04-07 TEAC
Item 04 - AEP Supplemental Projects p. 11
Don Marquis, OH “Install four (4) 63kA 5000A breakers for two (2) additional feeds”
345kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.