Named in 3 PJM planning documents for 1 project, from July 17, 2026 to October 6, 2026.

Existingdescribed as
AEPzone
138kV, 69kVkV as printed
3mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Addison - Lick, Addison - Haners Upgrades
AEP-2022-OH067, AEP-2022-OH069 · s3958.1-8
Conceptual $165.726 M 10/08/2032 20.6 MVA 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named ADDISON; CHICKAMAUGA; GAVIN; HANERS; LICK; RIO; SPORN → ADDISON; CHICKAMAUGA; GAVIN; HANERS; LICK; NORTH PROCTORVILLE; RIO; SPORN 2026-10-06 Not reported
Substations named ADDISON; CHICKAMAUGA; GAVIN; HANERS; LICK; NORTH PROCTORVILLE; RIO; SPORN → ADDISON; CHICKAMAUGA; GAVIN; HANERS; LICK; RIO; SPORN 2026-07-17 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-07* SRRTEP Western
AEP local plan submission of the supplemental projects for 2026 RTEP p. 79
Addison - Lick, Addison - Haners Upgrades “Replace the Distribution 69/13.09 kV 25MVA transformer at Haners”
69kV
2026-10-06 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 83
Addison - Lick, Addison - Haners Upgrades “Replace the Distribution 69/13.09 kV 25MVA transformer at Haners with a 138/13.08 kV 25 MVA non-LTC transformer”
138kV
2026-07-17 SRRTEP Western
Item 04 - AEP Supplemental Projects p. 28
Addison - Lick, Addison - Haners Upgrades “Replace the Distribution 69/13.09 kV 25MVA transformer at Haners”