Substation Scout

Leesville

Named in 1 PJM planning document for 1 project, on May 6, 2025.

Existingdescribed as
AEPzone
138kVkV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AEP/Dominion Transmission Zones 138kV Line Leesville(AEP) – Altavista(DOM)
b4000.207
Not printed 1.6 M 12/31/2029 Not printed 2025-05-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$0.6 M → 1.6 M 2025-05-06 2025-05-06

Every mention

DateDocumentProjectWhat the document says about it
2025-05-06 TEAC
Item 10 - Reliability Analysis Update p. 11
AEP/Dominion Transmission Zones 138kV Line Leesville(AEP) – Altavista(DOM) “(AEP) Leesville 138kV Station Upgrade: Replace”
138kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this