Substation Scout

Clell

Named in 1 PJM planning document for 1 project, on July 18, 2025.

Existingdescribed as
AEPzone
—kV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AEP Transmission Zone: Baseline B3333 Reactivation and Scope Change
B3333
Not printed $106.589M 12/10/2027 Not printed 2025-07-18
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
$40.171 M → $106.589M 2025-07-18 2025-07-18

Every mention

DateDocumentProjectWhat the document says about it
2025-07-18 SRRTEP Western
Item 01 - Reliability Analysis Update p. 4
AEP Transmission Zone: Baseline B3333 Reactivation and Scope Change “At Clell SS, Replace (2) 600A POP Switches and Poles with single 2 3 Way 1200A POP Switch and Pole.”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this