Circleville
Named in 1 PJM planning document for 1 project, on November 13, 2026.
Same name on other Substation Scout pages
Other sources that print a substation named “Circleville”. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- Circleville: PJM interconnection queue (OH)
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Endor Station AEP-2025-OH010 |
Not printed | $54.887 M | 01/01/2029 | 135 MW | 2026-11-13 SRRTEP Western |
Other substations in this project
“Endor Station” also names 6 other substations, with what the most recent document says about each.
- Endor AEP New — “Construct a greenfield five breaker ring bus station” (p. 13)
- Good Hope SW AEP Not stated
- Good Hope Switch AEP Work described at it — “the existing Good Hope Switch - Harrison 138kV single circuit line will be rebuilt” (p. 13)
- Harrison AEP, OH Work described at it — “Add one 138kV circuit breaker at the existing Harrison station” (p. 13)
- Lemaster AEP Not stated
- Lockbourne AEP Not stated
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | GOOD HOPE SW; LEMASTER; LOCKBOURNE → CIRCLEVILLE; ENDOR; GOOD HOPE; HARRISON; LEMASTER; LOCKBOURNE | 2025-10-17 | 2026-11-13 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-11-13 | SRRTEP Western Item 02 - AEP Supplemental Projects Presentation p. 16 |
Endor Station | No role wording 138kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation", or when a PJM document prints a rename for the same project (src/ingest/rtepAliases.json; the entry lists its old names).
- role is "new" only where a cited document phrase calls the substation new, describes constructing it, or calls it proposed (graded by src/lib/roleBasis.js), "existing" where a phrase describes work at it, otherwise "unknown".
- expansion is set on a substation that is not "new" where a cited phrase describes a new voltage level, a new or expanded yard, bus or bay, or a named load connected to it (graded by src/lib/expansionBasis.js). It reproduces what the document describes and adds nothing to it.
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.