Substation Scout

Circleville

Named in 1 PJM planning document for 1 project, on November 13, 2026.

Not stateddescribed as
AEPzone
138kVkV as printed
1mentions

Same name on other Substation Scout pages

Other sources that print a substation named “Circleville”. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Endor Station
AEP-2025-OH010
Not printed $54.887 M 01/01/2029 135 MW 2026-11-13
SRRTEP Western

Other substations in this project

“Endor Station” also names 6 other substations, with what the most recent document says about each.

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named GOOD HOPE SW; LEMASTER; LOCKBOURNE → CIRCLEVILLE; ENDOR; GOOD HOPE; HARRISON; LEMASTER; LOCKBOURNE 2025-10-17 2026-11-13

Every mention

DateDocumentProjectWhat the document says about it
2026-11-13 SRRTEP Western
Item 02 - AEP Supplemental Projects Presentation p. 16
Endor Station No role wording
138kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.