Named in 2 PJM planning documents for 1 project, from September 19, 2025 to October 6, 2026.

Existingdescribed as
AEPzone
138kVkV as printed
2mentions

Also printed as: Elcona Tap Switch

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Elcona Tap, IN
AEP-2025-IM003 · s3828.1-4
Conceptual $18.128 M 05/02/2029 Not printed 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named DUNLAP; EAST ELKHART; ELCONA; ELCONA TAP → DUNLAP; EAST ELKHART; ELCONA 2026-10-06 Not reported
Substations named ELCONA → DUNLAP; EAST ELKHART; ELCONA; ELCONA TAP 2025-02-14 2025-09-19

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 21
Elcona Tap, IN “Retire the existing Elcona Tap Switch 138kV”
138kV
2025-09-19 SRRTEP Western
Item 06 - AEP Supplemental Projects p. 12
Elcona Tap, IN “Retire the existing Elcona Tap Switch 138kV”
138kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.