Conrail SW
Named in 3 PJM planning documents for 1 project, from May 15, 2026 to October 6, 2026.
Newdescribed as
AEPzone
—kV as printed
3mentions
Described as new: “new 3-way pop switch called Conrail SW” — source, page 66
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Illinois Road, IN/Gateway, IN AEP-2024-IM012 · s3953.1-2 |
Engineering | $55.628 M | 08/15/2030 | Not printed | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | CONRAIL SW; GATEWAY; ILLINOIS RD → CONRAIL SW; GATEWAY; ILLINOIS ROAD | 2026-10-06 | Not reported |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-07* | SRRTEP Western AEP local plan submission of the supplemental projects for 2026 RTEP p. 66 |
Illinois Road, IN/Gateway, IN | “new 3-way pop switch called Conrail SW” |
| 2026-10-06 | TEAC Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 66 |
Illinois Road, IN/Gateway, IN | “Replace the Lincolnway 3-way POP switch with a new 3-way pop switch called Conrail SW” |
| 2026-05-15 | SRRTEP Western Item 01 - AEP Supplemental Projects p. 11 |
Illinois Road, IN/Gateway, IN | “Replace the Lincolnway 3-way POP switch with a new 3-way pop switch called Conrail SW.” |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.