Benwood

Named in 2 PJM planning documents for 2 projects, from October 18, 2024 to November 15, 2024.

Existingdescribed as
AEPzone
69kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AEP Transmission Zone: Baseline Benwood 69kV A CB Replacement
b3886.1
Not printed $1.0M 6/1/2026 Not printed 2024-11-15
SRRTEP Western
AEP Transmission Zone: Baseline Benwood 69kV A CB Replacement Not printed $1.0M 6/1/2026 Not printed 2024-10-18
SRRTEP Western

Every mention

DateDocumentProjectWhat the document says about it
2024-11-15 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 19
AEP Transmission Zone: Baseline Benwood 69kV A CB Replacement “Replace over duty Benwood 69kV circuit breaker A”
69kV
2024-10-18 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 17
AEP Transmission Zone: Baseline Benwood 69kV A CB Replacement “Replace over duty Benwood 69kV circuit breaker A”
69kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.