Substation Scout

Venator Station

Named in 1 PJM planning document for 1 project, on December 1, 2026.

Not stateddescribed as
AEPzone
765/345 kVkV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Venator Station
AEP-2026-AP007
Conceptual $324.2 M 10/22/2028 1000 MW 2026-12-01
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named BAKER; HANGING ROCK → BAKER; HANGING ROCK; VENATOR 2026-07-07 2026-12-01

Every mention

DateDocumentProjectWhat the document says about it
2026-12-01 TEAC
Item 03 - AEP Supplemental Projects - Presentation p. 12
Venator Station “Install four 765 kV Circuit Breakers in a breaker and a half configuration”
765/345 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.