Ebersole
Named in 1 PJM planning document for 1 project, on December 1, 2026.
Existingdescribed as
AEPzone
138kVkV as printed
1mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Northwest Ohio 345kV Customer Delivery Points & System Reinforcements AEP-2024-IM014, AEP-2025-OH016, AEP-2025-OH017, AEP-2025-OH018, AEP-2025-OH019 |
Conceptual | $607.548 M | 09/26/2031 | 1,300 MW | 2026-12-01 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | ALLEN; EAST LIMA; RP MONE; SORENSON → BOSC 1A 1B CUSTOMER; BOSC 2A 2B CUSTOMER; EAST LIMA; EBERSOLE; FLAG CITY; FOSTORIA CENTRAL; HILLCREST; LYKA; MADDOX CREEK; NORSE; NORTH FINDLAY; PALMER 1 2 CUSTOMER; PEONY 1 2 CUSTOMER; PYRITE; SAIDIN; SORENSON; VALOR 1 2 CUSTOMER; WAYNE TRACE; WAYNEDALE | 2024-11-06 | 2026-12-01 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-12-01 | TEAC Item 03 - AEP Supplemental Projects - Presentation p. 38 |
Northwest Ohio 345kV Customer Delivery Points & System Reinforcements | “North Findlay - Ebersole 138kV circuit” 138kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation", or when a PJM document prints a rename for the same project (src/ingest/rtepAliases.json; the entry lists its old names).
- role is "new" only where a cited document phrase calls the substation new, describes constructing it, or calls it proposed (graded by src/lib/roleBasis.js), "existing" where a phrase describes work at it, otherwise "unknown".
- expansion is set on a substation that is not "new" where a cited phrase describes a new voltage level, a new or expanded yard, bus or bay, or a named load connected to it (graded by src/lib/expansionBasis.js). It reproduces what the document describes and adds nothing to it.
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.