Named in 2 PJM planning documents for 2 projects, from October 18, 2024 to November 15, 2024.

Existingdescribed as
AEPzone
138kVkV as printed
2mentions

PJM interconnection queue

A PJM queue substation page has the same name: Cloverdale (VA) — 2 queue requests filed, 1 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AEP Transmission Zone: Baseline Cloverdale 138kV XT8 Circuit Switcher Replacement
b3897.1
Not printed $1.0M 6/1/2026 Not printed 2024-11-15
SRRTEP Western
AEP Transmission Zone: Baseline Cloverdale 138kV XT8 Circuit Switcher Replacement Not printed $1.0M 6/1/2026 Not printed 2024-10-18
SRRTEP Western

Every mention

DateDocumentProjectWhat the document says about it
2024-11-15 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 9
AEP Transmission Zone: Baseline Cloverdale 138kV XT8 Circuit Switcher Replacement “Replace over duty Cloverdale 138kV circuit switcher XT8”
138kV
2024-10-18 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 7
AEP Transmission Zone: Baseline Cloverdale 138kV XT8 Circuit Switcher Replacement “Replace over duty Cloverdale 138kV circuit switcher XT8”
138kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.