Substation Scout

Jennings Road Switch

Named in 3 PJM planning documents for 1 project, from December 12, 2025 to October 6, 2026.

Not stateddescribed as
AEPzone
69 kVkV as printed
3mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Jennings Road Switch, OH/Sharp Road, OH/Commerce, OH
AEP-2024-OH028 · s3884.1-3
Conceptual $2.575 M 08/04/2027 12.031 MW 2026-10-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named COMMERCE; JENNINGS ROAD; SHARP RD; SHARP ROAD → COMMERCE; JENNINGS ROAD; SHARP ROAD 2025-12-12 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2026-10-07* SRRTEP Western
AEP local plan submission of the supplemental projects for 2026 RTEP p. 45
Jennings Road Switch, OH/Sharp Road, OH/Commerce, OH “Add Phase over Phase switch with auto-sectionalizing named Jennings Road Switch”
2026-10-06 TEAC
Informational Only - AEP Local Plan Submission of the Supplemental Projects for 2026 p. 45
Jennings Road Switch, OH/Sharp Road, OH/Commerce, OH “Add Phase over Phase switch with auto-sectionalizing named Jennings Road Switch”
2025-12-12 SRRTEP Western
Item 15 - AEP Supplemental Projects p. 4
Jennings Road Switch, OH/Sharp Road, OH/Commerce, OH “Add Phase over Phase switch with auto-sectionalizing named Jennings Road Switch cut-in”
69 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.