Substation Scout

Razzler station

Named in 1 PJM planning document for 1 project, on December 1, 2026.

Newdescribed as
AEPzone
765kV/345kVkV as printed
1mentions

Described as new. The quoted wording calls this substation new. “Construct greenfield 765kV/345kV Razzler station” — source, page 17

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Razzler Customer Delivery
AEP-2025-OH014, AEP-2026-OH043
Conceptual $416.94 M 11/07/2028 1000MW 2026-12-01
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
In-service date 05/01/2029 → 11/07/2028 2025-08-05 2026-12-01
Substations named HANGING ROCK → ALTHEA; BONZO; DISTERDICK; EAST HAVERHILL; FRANKLIN FURNACE SW; HANGING ROCK; HAVERHILL; IRONTON; JEFFERSON; NORTH HAVERHILL; PORTSMOUTH; RAZZLER 2025-08-05 2026-12-01

Every mention

DateDocumentProjectWhat the document says about it
2026-12-01 TEAC
Item 03 - AEP Supplemental Projects - Presentation p. 17
Razzler Customer Delivery “Construct greenfield 765kV/345kV Razzler station”
765kV/345kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.