Razzler station
Named in 1 PJM planning document for 1 project, on December 1, 2026.
Newdescribed as
AEPzone
765kV/345kVkV as printed
1mentions
Described as new. The quoted wording calls this substation new. “Construct greenfield 765kV/345kV Razzler station” — source, page 17
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Razzler Customer Delivery AEP-2025-OH014, AEP-2026-OH043 |
Conceptual | $416.94 M | 11/07/2028 | 1000MW | 2026-12-01 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| In-service date | 05/01/2029 → 11/07/2028 | 2025-08-05 | 2026-12-01 |
| Substations named | HANGING ROCK → ALTHEA; BONZO; DISTERDICK; EAST HAVERHILL; FRANKLIN FURNACE SW; HANGING ROCK; HAVERHILL; IRONTON; JEFFERSON; NORTH HAVERHILL; PORTSMOUTH; RAZZLER | 2025-08-05 | 2026-12-01 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-12-01 | TEAC Item 03 - AEP Supplemental Projects - Presentation p. 17 |
Razzler Customer Delivery | “Construct greenfield 765kV/345kV Razzler station” 765kV/345kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation", or when a PJM document prints a rename for the same project (src/ingest/rtepAliases.json; the entry lists its old names).
- role is "new" only where a cited document phrase calls the substation new, describes constructing it, or calls it proposed (graded by src/lib/roleBasis.js), "existing" where a phrase describes work at it, otherwise "unknown".
- expansion is set on a substation that is not "new" where a cited phrase describes a new voltage level, a new or expanded yard, bus or bay, or a named load connected to it (graded by src/lib/expansionBasis.js). It reproduces what the document describes and adds nothing to it.
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.
Site Scanner