Named in 4 PJM planning documents for 3 projects, from October 18, 2024 to March 4, 2025.

Existingdescribed as
AEPzone
69 kV, 765kV as printed
4mentions

Also printed as: Jefferson Switch

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AEP Transmission Zone: Baseline Firebrick – Jefferson 69kV Reconductor
b3875.1
Not printed $8.5M 4/1/2029 Not printed 2024-11-15
SRRTEP Western
AEP Transmission Zone: Baseline Firebrick – Jefferson 69kV Reconductor Not printed $8.5M 4/1/2029 Not printed 2024-10-18
SRRTEP Western
Greentown, IN
AEP-2024-IM018
Conceptual $173M 2032-2034 Not printed 2025-03-04
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $173M → $0M (PJM) 2025-03-04 2026-10-06
In-service date 06/01/2032 → 2032-2034 2024-12-03 2025-03-04
Substations named BABCOCK; DRESSER; FAIRBANKS; GREEN ACRES; GREENTOWN; GWYNNEVILLE; HANNA; JEFFERSON; LULU; OLIVE; ROCKPORT; SORENSON; SULLIVAN; TANNERS CREEK; UNIVERSITY PARK → BABCOCK; BATESVILLE; DRESSER; FAIRBANKS; FALL CREEK; GREEN ACRES; GREENTOWN; GWYNNEVILLE; HANNA; JEFFERSON; LULU; MADISON COUNTY; OLIVE; PIKE COUNTY; ROCKPORT; SORENSON; SULLIVAN; SUNNYSIDE; TANNERS CREEK; UNIVERSITY PARK 2024-12-03 2025-03-04
Substations named BABCOCK; BATESVILLE; DRESSER; FAIRBANKS; FALL CREEK; GREEN ACRES; GREENTOWN; GWYNNEVILLE; HANNA; JEFFERSON; LULU; MADISON COUNTY; OLIVE; PIKE COUNTY; ROCKPORT; SORENSON; SULLIVAN; SUNNYSIDE; TANNERS CREEK; UNIVERSITY PARK → BABCOCK; BATESVILLE; GWYNNEVILLE; MADISON COUNTY; PIKE COUNTY; SORENSON; SULLIVAN 2025-03-04 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2025-03-04 TEAC
Item 08 - AEP Supplemental Projects p. 3
Greentown, IN No role wording
765
2024-12-03 TEAC
Item 08 - AEP Supplemental Projects p. 4
Greentown, IN No role wording
765
2024-11-15 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 29
AEP Transmission Zone: Baseline Firebrick – Jefferson 69kV Reconductor “Replace 600A Switches at Jefferson”
69 kV
2024-10-18 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 28
AEP Transmission Zone: Baseline Firebrick – Jefferson 69kV Reconductor “Replace 600A Switches at Jefferson”
69 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.