Lammer

Named in 1 PJM planning document for 1 project, on November 15, 2024.

Not stateddescribed as
AEPzone
138 kVkV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
AEP Transmission Zone: Baseline East Leipsic – AE2-072 (Lammer) Sag Study and Mitigation
b3888.1
Not printed $2.5M 4/1/2029 Not printed 2024-11-15
SRRTEP Western

Every mention

DateDocumentProjectWhat the document says about it
2024-11-15 SRRTEP Western
Item 01 - SRRTEP West - Reliability Analysis Update p. 38
AEP Transmission Zone: Baseline East Leipsic – AE2-072 (Lammer) Sag Study and Mitigation No role wording
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.