Shinkrock

Named in 2 PJM planning documents for 2 projects, from November 6, 2024 to November 19, 2024.

Not stateddescribed as
ATSIzone
138 kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Cluster 2 (ATSI) Not printed Not printed Not printed Not printed 2024-11-06
TEAC
Rebuild/Reconductor existing 138 kV lines/Terminal upgrades at 345 kV substations Not printed 265.1 Not printed Not printed 2024-11-19
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2024-11-19 TEAC
Item 1 - Reliability Analysis Update p. 32
Rebuild/Reconductor existing 138 kV lines/Terminal upgrades at 345 kV substations No role wording
138 kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 58
Cluster 2 (ATSI) No role wording
138 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.