Substation Scout

Aurora

Named in 2 PJM planning documents for 2 projects, from November 15, 2024 to February 14, 2025.

Not stateddescribed as
COMEDzone
138 kVkV as printed
2mentions

PJM interconnection queue

A PJM queue substation page has the same name: Aurora (IL) — 4 queue requests filed, 4 active.

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Customer in Aurora
ComEd-2024-002
Engineering $0M 12/31/26 130 MW 2024-11-15
SRRTEP Western
Customer in Aurora
ComEd-2024-022
Engineering $0M 12/31/27 91 MW 2025-02-14
SRRTEP Western

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Substations named AURORA; ELECTRIC JUNCTION → ELECTRIC JUNCTION 2024-11-15 2025-10-08

Every mention

DateDocumentProjectWhat the document says about it
2025-02-14 SRRTEP Western
Item 03 - ComEd Supplemental Projects p. 10
Customer in Aurora No role wording
138 kV
2024-11-15 SRRTEP Western
Item 03 - ComEd Supplemental Projects p. 6
Customer in Aurora No role wording

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this