Named in 7 PJM planning documents for 7 projects, from October 8, 2024 to August 4, 2026.
Also printed as: Richmond Substation
PJM interconnection queue
A PJM queue substation page has the same name: Richmond (PA) — 7 queue requests filed, 1 active.
Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Richmond - Tacony 69 kV b3864.1 |
Not printed | $0.350 M | 6/1/2029 | Not printed | 2024-11-14 SRRTEP Mid-Atlantic |
| PECO Transmission Zone: Baseline b3907.1 |
Not printed | $43.22 M | 6/1/2029 | Not printed | 2024-12-03 TEAC |
| Richmond - Tacony 69 kV | Not printed | $0.350 M | 6/1/2029 | Not printed | 2024-10-17 SRRTEP Mid-Atlantic |
| Tacony Substation Rebuild PE-2024-001 · s3383.1 & s3383.2 |
Engineering | $17M | 12/31/27 | Not printed | 2024-10-08 TEAC |
| Navy Yard-Richmond New 230kV Line PE-2025-008 |
Engineering | Not printed | Phase 1 – 12/31/2029, Phase 2 – 6/1/2031 | 500 MW | 2026-04-07 TEAC |
| PE-2026-013 | Not printed | Not printed | Not printed | Not printed | 2026-08-04 TEAC |
| PECO Transmission Zone: Baseline 2024-W1-12 |
Not printed | $43.22 M | 6/1/2029 | Not printed | 2024-11-06 TEAC |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-08-04 | TEAC Item 09 - PECO Supplemental Projects p. 4 |
PE-2026-013 | No role wording 230 kV |
| 2026-04-07 | TEAC Item 08 - PECO Supplemental Projects p. 12 |
Navy Yard-Richmond New 230kV Line | “replace breakers, disconnects, station cable and bus work at Richmond.” |
| 2024-12-03 | TEAC Item 11 - Reliability Analysis Update p. 45 |
PECO Transmission Zone: Baseline | No role wording 230 kV |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 7 |
Richmond - Tacony 69 kV | “Replace station cable at Richmond 69 kV” 69 kV |
| 2024-11-06 | TEAC Item 13 - Reliability Analysis Update p. 45 |
PECO Transmission Zone: Baseline | No role wording 230 kV |
| 2024-10-17 | SRRTEP Mid-Atlantic Item 01 - SRRTEP Mid-Atlantic - Reliability Analysis Update p. 7 |
Richmond - Tacony 69 kV | “Replace station cable at Richmond 69 kV” 69 kV |
| 2024-10-08 | TEAC Informational Only - PECO Local Plan submission of supplemental project 2024 p. 8 |
Tacony Substation Rebuild | No role wording 69kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.