Named in 3 PJM planning documents for 3 projects, from November 6, 2024 to May 6, 2025.

Existingdescribed as
DPLzone
230kVkV as printed
3mentions

Also printed as: Cedar Creek Substation

PJM interconnection queue

A PJM queue substation page has the same name: Cedar Creek (DE) — 4 queue requests filed, 1 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
DPL Transmission Zone: Baseline
b3793.1
Not printed $8.7 M 6/1/2028 Not printed 2025-05-06
TEAC
Milford and Cedar Creek Facility Upgrades
b3866.1
Not printed $0.200M 12/31/2029 Not printed 2024-12-03
TEAC
Milford and Cedar Creek Facility Upgrades Not printed $0.200M 12/31/2029 Not printed 2024-11-06
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2025-05-06 TEAC
Item 10 - Reliability Analysis Update p. 14
DPL Transmission Zone: Baseline “Cedar Creek– Replace three (3) standalone CTs, disconnect switch, stranded bus, and rigid bus”
230kV
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 40
Milford and Cedar Creek Facility Upgrades “Adjust relay setting at Cedar Creek (Cedar Creek – Milford) Substation”
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 40
Milford and Cedar Creek Facility Upgrades “Adjust relay setting at Cedar Creek Substation”