Muhlenberg Substation
Named in 5 PJM planning documents for 2 projects, from November 14, 2024 to October 6, 2026.
Existingdescribed as
METEDzone
69 kVkV as printed
5mentions
Also printed as: Muhlenberg
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Muhlenberg 69 kV Substation ME-2024-005 · s3976.1 |
Not printed | $29.29M | 10/22/2027 | 33 MW | 2026-10-06 TEAC |
| Muhlenberg - North Temple 69 kV 834 Line Rebuild, PA ME-2024-023 |
Conceptual | $21.57 M | 12/31/2029 | Not printed | 2026-08-13 SRRTEP Mid-Atlantic |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-07* | SRRTEP Mid-Atlantic Met-Ed local plan submission for 2026 RTEP p. 17 |
Muhlenberg 69 kV Substation | “Convert Muhlenberg Substation into a nine-breaker 69 kV Breaker-and-a-Half
substation.” 69 kV |
| 2026-10-06 | TEAC Informational Only - MetEd Local Plan Submission of Supplemental Projects for 2026 p. 16 |
Muhlenberg 69 kV Substation | “Convert Muhlenberg Substation into a nine-breaker 69 kV Breaker-and-a-Half substation” 69 kV |
| 2026-08-13 | SRRTEP Mid-Atlantic Item 03 - MetEd Supplemental Projects p. 7 |
Muhlenberg - North Temple 69 kV 834 Line Rebuild, PA | “At Muhlenberg Substation, adjust relay settings” 69 kV |
| 2026-03-18 | SRRTEP Mid-Atlantic Item 07 - MetEd Supplemental Projects p. 8 |
Muhlenberg 69 kV Substation | “Convert Muhlenberg Substation into a nine-breaker 69 kV Breaker-and-a-Half substation.” 69 kV |
| 2024-11-14 | SRRTEP Mid-Atlantic Item 04 - MetEd Supplemental Projects p. 4 |
Muhlenberg - North Temple 69 kV 834 Line Rebuild, PA | No role wording 69 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.