Substation Scout

Wagner

Named in 2 PJM planning documents for 2 projects, from November 6, 2024 to December 3, 2024.

Not stateddescribed as
BGEzone
230/115 kVkV as printed
2mentions

PJM interconnection queue

A PJM queue substation page has the same name: Wagner (MD) — 5 queue requests filed, 1 active.

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
BGE Local N-1-1
b3906.1
Not printed $107.62M 06/01/2029 Not printed 2024-12-03
TEAC
BGE Local N-1-1 Not printed Not printed Not printed Not printed 2024-11-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $107.62M → 122.07 2024-12-03 2026-10-06
Cost estimate
prior value printed on the same page
107.62 → 122.07 2026-10-06 2026-10-06
Substations named CHESTNUT HILL; FREDERICK RD; HOWARD; MARLEY NECK; NORTH EAST; PUMPHREY; WAGNER → MARLEY NECK 2024-12-03 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 42
BGE Local N-1-1 No role wording
230/115 kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 42
BGE Local N-1-1 No role wording
230/115 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this