Substation Scout

Master

Named in 6 PJM planning documents for 4 projects, from November 6, 2024 to October 16, 2026.

Existingdescribed as
PECOzone
138kV, 230 kV, 230/138kVkV as printed
6mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
PECO Transmission Zone: Baseline
b3907.1
Not printed $43.22 M 6/1/2029 Not printed 2024-12-03
TEAC
PE-2026-003 Under construction $3.5 million 3/25/2026 Not printed 2026-10-06
TEAC
PE-2026-017 Not printed Not printed Not printed Not printed 2026-10-16
SRRTEP Mid-Atlantic
PECO Transmission Zone: Baseline
2024-W1-12
Not printed $43.22 M 6/1/2029 Not printed 2024-11-06
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-10-16 SRRTEP Mid-Atlantic
Item 03 - PECO Supplemental Projects Presentation p. 4
PE-2026-017 No role wording
138kV
2026-10-06 TEAC
Informational Only - PECO Local Plan Submission of Supplemental Projects for 2026 p. 20
PE-2026-003 “Master transformer #8 is a 230/138kV transformer installed in 1970”
230/138kV
2026-03-18 SRRTEP Mid-Atlantic
Item 03 - PECO Supplemental Projects p. 5
PE-2026-003 “Replacement of the Master #8 transformer”
230/138kV
2026-02-12 SRRTEP Mid-Atlantic
Item 09 - PECO Supplemental Projects p. 3
PE-2026-003 “Master transformer #8 is a 230/138kV transformer installed in 1970”
230/138kV
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 45
PECO Transmission Zone: Baseline No role wording
230 kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 45
PECO Transmission Zone: Baseline No role wording
230 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this