Substation Scout

Conastone

Named in 3 PJM planning documents for 2 projects, from October 8, 2024 to July 8, 2025.

Existingdescribed as
BGEzone
230 kVkV as printed
3mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Cancellation of b3737.52
b3737.52
Cancelled $1.3M Not printed Not printed 2025-07-08
TEAC
BGE Transmission Zone: Baseline Conastone 230 kV 2322 B5 CB Replacement
b3857
Not printed $1.921M 6/1/2029 Not printed 2024-11-06
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2025-07-08 TEAC
Item 11 - Reliability Analysis Update p. 16
Cancellation of b3737.52 “Replace one 63 kA circuit breaker "B4" at Conastone 230 kV with 80 kA”
230 kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 19
BGE Transmission Zone: Baseline Conastone 230 kV 2322 B5 CB Replacement “Replace over duty Conastone 230 kV circuit breaker”
230 kV
2024-10-08 TEAC
Item 09 - Reliability Analysis Update p. 16
BGE Transmission Zone: Baseline Conastone 230 kV 2322 B5 CB Replacement “Replace over duty Conastone 230 kV circuit breaker 2322 B5”
230 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this