Substation Scout

Frederick Rd.

Named in 2 PJM planning documents for 2 projects, from November 6, 2024 to December 3, 2024.

Existingdescribed as
BGEzone
115 kVkV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
BGE Local N-1-1
b3906.1
Not printed $107.62M 06/01/2029 Not printed 2024-12-03
TEAC
BGE Local N-1-1 Not printed Not printed Not printed Not printed 2024-11-06
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate $107.62M → 122.07 2024-12-03 2026-10-06
Cost estimate
prior value printed on the same page
107.62 → 122.07 2026-10-06 2026-10-06
Substations named CHESTNUT HILL; FREDERICK RD; HOWARD; MARLEY NECK; NORTH EAST; PUMPHREY; WAGNER → MARLEY NECK 2024-12-03 2026-10-06

Every mention

DateDocumentProjectWhat the document says about it
2024-12-03 TEAC
Item 11 - Reliability Analysis Update p. 42
BGE Local N-1-1 No role wording
115 kV
2024-11-06 TEAC
Item 13 - Reliability Analysis Update p. 43
BGE Local N-1-1 “transmission lines to the line switches at Frederick Rd”
115 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this