Substation Scout

Navy North

Named in 2 PJM planning documents for 3 projects, from November 6, 2024 to January 7, 2025.

Existingdescribed as
DOMzone
230kVkV as printed
3mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Additional Upgrade (Dominion)
b3928.1
Not printed $3 M 3/31/2026 Not printed 2025-01-07
TEAC
Dominion Transmission Zone: Supplemental Operational Flexibility and Efficiency
DOM-2022-0058
Cancelled Not printed Not printed Not printed 2024-11-06
TEAC
Dominion Transmission Zone: Supplemental Do No Harm Analysis
DOM-2023-0006-DNH
Engineering $3 M 3/31/2026 Not printed 2024-11-06
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2025-01-07 TEAC
Item 12 - Reliability Analysis Update p. 77
Additional Upgrade (Dominion) “associated equipment at Navy North”
230kV
2024-11-06 TEAC
Item 12 - Dominion Supplemental Projects p. 19
Dominion Transmission Zone: Supplemental Operational Flexibility and Efficiency No role wording
230kV
2024-11-06 TEAC
Item 12 - Dominion Supplemental Projects p. 23
Dominion Transmission Zone: Supplemental Do No Harm Analysis “Install 230kV 50 MVAR capacitor bank and breaker at Navy North substation.”
230kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this