Crystal Springs
Named in 4 PJM planning documents for 2 projects, from September 18, 2025 to October 6, 2026.
Existingdescribed as
BGEzone
34kV & 13kVkV as printed
4mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| High Ridge to Dorsey Tap to Crystal Springs Tap BGE-2025-003 |
Not printed | Not printed | Not printed | Not printed | 2025-09-18 SRRTEP Mid-Atlantic |
| High Ridge to Dorsey Tap to Crystal Springs Tap BGE-2025-007 · s3789 |
Engineering | $12.4M | 6/31/2027 | Not printed | 2026-10-06 TEAC |
Changes between documents
Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.
| What changed | Printed values | Earlier | Later |
|---|---|---|---|
| Substations named | WINDY EDGE → CRYSTAL SPRINGS; CRYSTAL SPRINGS TAP; DORSEY RUN; DORSEY TAP; HIGH RIDGE | 2025-08-14 | 2025-09-18 |
| Substations named | CRYSTAL SPRINGS; CRYSTAL SPRINGS TAP; DORSEY RUN; DORSEY TAP; HIGH RIDGE → WINDY EDGE | 2025-09-18 | 2025-11-13 |
| Substations named | CRYSTAL SPRINGS; CRYSTAL SPRINGS TAP; DORSEY RUN; DORSEY RUN TAP; HIGH RIDGE → CRYSTAL SPRINGS; DORSEY RUN | 2025-11-13 | 2026-10-06 |
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2026-10-06 | TEAC Informational Only - BGE Local Plan Submission of Supplemental Projects for 2026 p. 16 |
High Ridge to Dorsey Tap to Crystal Springs Tap | No role wording 34kV & 13kV |
| 2026-10-01* | SRRTEP Mid-Atlantic BGE local plan submission for 2026 RTEP p. 16 |
High Ridge to Dorsey Tap to Crystal Springs Tap | “vicinity of its Dorsey Run–
Crystal Springs 34kV & 13kV Distribution stations” 34kV & 13kV |
| 2025-11-13 | SRRTEP Mid-Atlantic Item 03 - BGE Supplemental Projects - Version 3 p. 14 |
High Ridge to Dorsey Tap to Crystal Springs Tap | “Dorsey Run– Crystal Springs 34kV & 13kV Distribution stations” 34kV & 13kV |
| 2025-09-18 | SRRTEP Mid-Atlantic Item 02 - BGE Supplemental Projects p. 3 |
High Ridge to Dorsey Tap to Crystal Springs Tap | “expansion of existing distribution facilities” 34kV & 13kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation".
- role is "new" only where a cited document phrase describes the substation as new or describes constructing it, "existing" where a phrase describes work at it, otherwise "unknown".
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.